[1] 张立辉, 潘楚云, 邹鑫. 重复性项目调度与网络模型转化方法研究[J]. 管理科学学报, 2014, 17(6): 49-59 ZHANG Lihui, PAN Chuyun, ZOU Xin. A method for converting repetitive scheduling models to network model[J]. Journal of Management Sciences in China, 2014, 17(6): 49-59 [2] CHEN F, JI H, WEI Y. Using network theory to explore the risk characteristics of bridge-tunnel hybrid construction[J]. IEEE Access, 2019, 7: 116038-116046 [3] ZHANG L, DAI G, ZOU X, et al. Robustness-based multi-objective optimization for repetitive projects under work continuity uncertainty[J]. Engineering Construction & Architectural Management, 2020, 27(10): 3095-3113 [4] MATTILA K, ABRAHAM D. Linear scheduling: past research efforts and future directions[J]. Engineering Construction & Architectural Management, 1998, 5(3): 294-303 [5] HEGAZY T, WASSEF N. Cost optimization in projects with repetitive nonserial activities[J]. Journal of Construction Engineering and Management, 2001, 127(3): 183-191 [6] HERROELEN W, LEUS R. On the merits and pitfalls of critical chain scheduling[J]. Journal of Operations Management, 2001, 19(5): 559-577 [7] CHTOUROU H, HAOUARI M. A two-stage-priority-rule-based algorithm for robust resource-constrained project scheduling[J]. Computers and Industrial Engineering, 2008, 55(1): 183-194 [8] 胡雪君, 赵雁, 单汩源, 等. 基于自适应大邻域搜索的鲁棒多项目调度方法[J]. 中国管理科学, 2022, 30(9): 217-231 HU Xuejun, ZHAO Yan, SHAN Miyuan, et al. An adaptive large neighborhood search metaheuristic for robust multi-project scheduling[J]. Chinese Journal of Management Science, 2022, 30(9): 217-231 [9] 马力, 管在林, 何敏, 等. 基于关键链的自适应缓冲设置方法研究[J]. 华中科技大学学报 (自然科学版) , 2008(11): 80-82 MA Li, GUAN Zailin, HE Min, et al. Research on the adaptive buffer sizing method based on the critical chain theory[J]. Journal of Huazhong University of Science & Technology (Natural Science Edition) , 2008(11): 80-82 [10] 王艺, 崔南方. 接驳缓冲设置中的独立时差策略[J]. 工业工程, 2015, 18(2): 127-141 WANG Yi, CUI Nanfang. Feeding buffer sizing approach based on independent float[J]. Industrial Engineering Journal, 2015, 18(2): 127-141 [11] HSIE M, CHANG C, YANG I, et al. Resource-constrained scheduling for continuous repetitive projects with time-based production units[J]. Automation in Construction, 2009, 18(7): 942-949 [12] SALAMA T, SALAH A, MOSELHI O. Integration of linear scheduling method and the critical chain project management[J/OL]. Canadian Journal of Civil Engineering, 2017, 45 (1) : (2017-10-01). https://doi.org/10.1139/cjce-2017-0020. [13] SALAMA T, MOSELHI O. Multi-objective optimization for repetitive scheduling under uncertainty[J]. Engineering, Construction and Architectural Management, 2019, 26(7): 1294-1320 [14] 张立辉, 邹鑫, 黄元生, 等. 重复性项目调度模型的时差分析[J]. 中国管理科学, 2018, 26(6): 95-103 ZHANG Lihui, ZOU Xin, HUANG Yuansheng, et al. Float analysis in repetitive scheduling model[J]. Chinese Journal of Management Science, 2018, 26(6): 95-103 [15] 马咏, 何正文, 江波, 等. 一种求解柔性资源约束前摄性项目调度问题的启发式算法[J]. 运筹与管理, 2021, 30(8): 14-51 MA Yong, HE Zhengwen, JIANG Bo, et al. A heuristic algorithm for solving flexible resource constrained proactive project scheduling problem[J]. Operations Research and Management Science, 2021, 30(8): 14-51 [16] 方一鸣, 郑贺军, 刘乐, 等. 基于模拟退火-粒子群算法优化支持向量机参数的连铸漏钢预报[J]. 中国机械工程, 2017, 28(12): 1462-1467 FANG Yiming, ZHENG Hejun, LIU Le, et al. Breakout prediction for continuous casting based on SA-PSO to optimize parameters of SVM[J]. Chinese Mechanical Engineering, 2017, 28(12): 1462-1467 [17] 王艳婷, 何正文, 刘人境. 随机多模式项目前摄性调度与反应性调度的权衡[J]. 管理工程学报, 2018, 32(4): 158-166 WANG Yanting, HE Zhengwen, LIU Renjing. Trade-off between stochastic multi-mode proactive scheduling and reactive scheduling[J]. Journal of Industrial Engineering and Engineering Management, 2018, 32(4): 158-166 [18] 钟雁, 董胜英, 刘仍奎, 等. 铁路建设工程进度计划优化模型研究[J]. 交通运输系统工程与信息, 2015, 15(5): 186-194 ZHONG Yan, DONG Shengying, LIU Rengkui, et al. Optimization model of railway construction project schedule[J]. Journal of Transportation Systems Engineering and Information Technology, 2015, 15(5): 186-194 [19] 苏义拉. 重复性建设项目中资源均衡问题的优化模型研究[D]. 北京: 华北电力大学, 2012. [20] 闫群民, 马瑞卿, 马永翔, 等. 一种自适应模拟退火粒子群优化算法[J]. 西安电子科技大学学报, 2021, 48(4): 120-127 YAN Qunmin, MA Ruiqing, MA Yongxiang, et al. Adaptive simulated annealing particle swarm optimization algorithm[J]. Journal of Xidian University, 2021, 48(4): 120-127
|