[1]王宏亮.准时制生产物流在中国汽车行业的应用[J].工业工程, 2009,12(6):57-61.
Wang Hong liang. Application of just in time material handling to auto industry in China[J]. Industrial Engineering Journal, 2009,12(6):57-61.
[2]徐学军,周武静,叶飞. TQM、TPM与准时制生产实施的关系及对绩效的影响[J].工业工程与管理,2010,15(6):68-74.Xu Xue jun, Zhou Wu jing, Ye Fei. Relationships among implementation of TQM,TPM and JIT, and JIT implementation effects on the performance[J]. Industrial Engineering and Management, 2010,15(6):68 -74.
[3]李沛,易树平,高庆萱.汽车零部件企业面向准时供货的生产计划[J].工业工程,2008,11(5):90- 92.Li Pei, Yi Shu ping, Gao Qingxuan. Production planning for JIT delivery oriented automobile parts enterprises[J]. Industrial Engineering Journal, 2008,11(5):90-92.
[4]Flappers D P,Miltenburg G J,Wijugard J. Embedding JIT into MRP[J].International Journal of Production Research,1991,29(2):329-341.
[5]Wejabi O,Wesserman G S. Basic concepts of JIT modeling[J].International Journal of Production Research,1992,30(1):141-149.
[6]齐二石,程文明.丰田生产方式评价指标体系的建立及其应用研究[J].科学学与科学技术管理, 2005,26(4):141-148. Qi Ershi,Cheng Wenming. Study on establishment and application of TPS evaluation index system[J]. Science of Science and Management of Science and Technology, 2005,3(4):141-148.
[7]曹振新,朱云龙.混流轿车总装配线上物料配送的研究与实践[J].计算机集成制造系统,2006,12(2):291-295.
Cao Zhenxin, Zhu Yunlong. Research on material feeding and its implementation in general assembly line of mixed model automobile[J].Computer Integrated Manufacturing Systems, 2006,12(2):291-295.
[8]林筠,李随成.多品种可变流水线平衡及改善[J].工业工程,2000,3(2):46-49.Lin Jun,Li Suicheng. Varied convertible assembly line balanced and improved[J].Industrial Engineering Journal,2000,3(2):46-49.
[9]Rekiek B,DeLit P,Delchambre A. Designing mixed product assembly lines[J].Robotics and Automation, IEEE Transactions, 2000,16(3): 268-280.
[10]Battini D, Faccio M, Persona A, et al. Design of the optimal feeding policy in an assembly system[J].International Journal of Production Economics,2009,121(1):233-254.
[11]Kubiak W. Minimizing variation of production rates in JIT systems: a survey[J].European Journal of Operational Research, 1993,66(3):259-271.
[12]Xiao bo Z, Ohno K. Algorithms for sequencing mixed models on an assembly line in a JIT production system [J].Computers and Industry Engineering,1997,32(1):47-56.
[13]Boysen N, Fliedner M, Scholl A. Sequencing mixed model assembly lines: Survey,classification and model critique[J]. European Journal of Operational Research, 2009,192(2):349-373.
[14]Cano B J, Roger Z, Mercado R. A scatter search based hyper heuristic for sequencing a mixed model assembly line [J]. Journal of Heuristics,2010,16(6):749-770.
[15]赵伟,韩文秀,罗永泰.准时生产方式下混流装配线的调度问题[J].管理科学学报,2000,3(4):23-28.Zhao Wei, Han Wen xiu,Luo Yong tai. Scheduling mixed model assembly lines in JIT production systems [J].Journal of Manegement Sciences In China, 2000,3(4):23-28.
[16]李随成,王锐.X公司工时与作业方法研究[J].工业工程,2006,9(3):116-120.
Li Sui cheng, Wang Rui. The study of man hour and operation method in the X company[J].Industrial Engineering Journal,2006,9(3):116-120. |