[1]顾幸生.不确定条件下的生产调度[J].华东理工大学学报,2000,26(5):441-446.
Gu Xing-sheng. A survey of production scheduling under uncertainty[J]. Journal of East China University of Science and Technology, 2000, 26(5): 441-446
[2]Leon V J, Wu S D, Storer R H. Robustness measures and robust scheduling for job shops[J]. IIE Transactions,1994, 26(5):32-43.
[3]Mehta S V, Uzsoy R. Predictable scheduling of a single machine subject to breakdowns[J]. International Journal of Computer Integrating Manufacturing, 1999, 12(1):15-38.
[4]Church L K, Uzsoy R. Analysis of periodic and event-driven rescheduling policies in dynamic shops [J]. International Journal of Computer Integrated Manufacturing, 1992, 5(3): 153-163.
[5]Ishii N, Muraki M. A process-variability-based on-line scheduling and control system in multiproduct batch process [J]. Computers and Chemical Engineering, 1996, 20(2): 217-234.
[6]Rodrigues M T M, Latre L G, Passos C A S, etc. Reactive scheduling approach for multipurpose chemical batch plants[J]. Computers and Chemical Engineering, 1996, 20(Supp1): S1215-S1220.
[7]乔威,王冰,孙洁. 用遗传算法求解一类不确定性作业车间调度问题[J]. 计算机集成制造系统, 2007, 13(12):2452-2455, 2468.
〖DW〗Qiao Wei, Wang Bing, Sun Jie. Uncertain job shop scheduling problems solved by genetic algorithm[J]. Computer Integrated Manufacturing Systems, 2007,13(12):2452-2455, 2468.
[8]尹文君,刘民,吴澄. 随机故障下单机鲁棒调度算法的遗传编程方法[J]. 清华大学学报:自然科学版,2005,45(1):81-84.
〖DW〗Yin Wen-jun, Liu Min, Wu Ceng. Learning single-machine robust scheduling heuristics subject to stochastic breakdowns using genetic programming [J]. Journal of Tsinghua University: Science & Technology, 2005, 45(1): 81-84.
[9]Sevaux M, Sorensen K. A genetic algorithm for robust schedules in a one-machine environment with ready times and due dates[J]. 4OR, 2004, 2(2): 129-147
[10]詹韬, 周泓, 薛贵森. 基于Arena的制造企业生产流程建模及仿真研究[J]. 仪器仪表学报, 2007, 28(8,增刊IV): 703-708.
Zhan Tao, Zhou Hong, Xue Gui-sen. Study on simulation modeling based on Arena for the production system of a manufacturing enterprise[J]. Chinese Journal of Scientific Instrument, 2007,28(8, S4): 703-708.
[11]Davenport A J, Gefflot C, Beck J C. Slackbased Techniques for Robust Schedules∥Proceeding of the Sixth European Conference on Planning (ECP2001)[C]. Toledo: Spain, 2001: 7-18.
[12]Briskorn D, Leung J, Pinedo M. Robust scheduling on a single machine using time buffers[J]. IIE Transactions, 2011, 43(6): 383-398.
[13]Briand C, La H T, Erschler J. A robust approach for the single machine scheduling problem[J].Journal of Scheduling, 2007, 10(3): 209-221.
[14]Pinedo M. Scheduling: theory, algorithm, and systems[M]. 3rd Edition. New York: Springer, 2008: 5354, 248-251.
[15]Billaut J C, Moukrim A, Sanlaville E. Flexibility and robustness in scheduling[M]. Hoboken, NJ: ISTE/John Wiley & Sons, 2008: 201-202.
[16]Erschler J, Fontan G, Merce C, et al. A new dominance concept in scheduling n jobs on a single machine with ready times and due dates[J]. Operations Research, 1983, 31(1):114-127 |