[1]张秋华. 基于时间和成本因素的供应链决策研究[D]. 南昌: 南昌大学, 2010.
Zhang Qiu-hua. A study on supply chain decision based on time and cost factors[D]. Nanchang: Nanchang University, 2010.
[2]George Stalk Jr. Time—the next source of competition advantage[J]. Harvard Business Review, 1988, 66(4): 41-51.
[3]Hum Sin-hoon , Sim Hoon-hong. Time-based competition: literature review and implications for modeling[J]. International Journal of Operations& Production Management, 1996, 16(1): 75-90.
[4]Xiao Tiao-jun, Jin Jiao, Chen Guo-hua, et al. Ordering, wholesale pricing and lead-time decisions in a threestage supply chain under demand uncertainty[J]. Computers & Industrial Engineering, 2010, 59(4):840-852.
[5]Li Yina, Xu Xuejun, Ye Fei. Supply chain coordination model with controllable lead time and service level constrain[J]. Computer & Industrial Engineering, 2011, 61(3): 858-864.
[6]李华, 李益强, 徐国华. 供应链配送中的提前期模型研究[J]. 管理工程学报, 2004, 18(3): 112-114.
Li Hua, Li Yi-qiang, Xu Guo-hua. Research on lead time model in supply chain distribution[J]. Journal of Industrial Engineering /Engineering Management, 2004, 18(3): 112-114.
[7]高波, 石书生. 时间价格敏感需求下供应链协调研究[J]. 工业工程, 2011, 14(3): 39-44.
Gao Bo, Shi Shu-sheng. Research on supply chain coordination with timeandprice sensitive demands[J]. Industrial Engineering Journal, 2011, 14(3): 39-44.
[8]So Kut C, Song Jing-sheng. Price, delivery time guarantees and capacity selection[J]. European Journal of operational research, 1988, 111(1): 28-49.
[9]马士华, 王福寿. 时间价格敏感型需求下的供应链决策模式研究[J]. 中国管理科学, 2006, 14(3): 13-19.
Ma Shi-hua, Wang Fushou. Study on the decision mode of supply chain for timesensitive and price-sensitive demand[J]. Chinese Journal of Management Science, 2006, 14(3): 13-19.
[10]Tamer Boyaci, Saibal Ray. Product differentiation and capacity cost interaction in time and price sensitive markets[J]. Manufacturing & Service operations management, 2003, 5(1): 18-36.
[11]张钦, 达庆利, 沈厚才. 供应链中基于Stackeberg博弈的EOQ模型[J]. 中国管理科学, 2002, 10(3): 38-42.
Zhang Qin, Da Qing-li, Shen Hou-cai. EOQ models based on Stackelberg Game in supply chain[J]. China Journal of Management Science, 2002, 10(3): 38-42.
[12]申成霖, 侯文华, 张新鑫. 基于信息共享视角的时间竞争型供应链决策[J]. 系统工程理论与实践, 2010, 30(2): 257-263.
Shen Cheng-lin, Hou Wen-hua, Zhang Xin-xin. Decision of time competitive supply chain from perspective of information-sharing[J]. Systems Engineering-Theory & Practice, 2010, 30(2): 257-263.
[13]刘龙英, 孙见荆. 基于时间竞争的供应链响应时间决策研究[J]. 海南大学学报:人文社会科学版, 2008, 26(2): 168-172.
Liu Longying, Sun Jian-jing. Study on the time decision of supply chain based on the competition of time[J]. Journal of Hainan University:Humanities & Social Sciences, 2008, 26(2): 168-172.
[14]Shanthikumar J G, Sumita U. Approximations for the time spent in a dynamic job shop with applications to due date assignment[J]. International Journal of production Research, 1988, 26(8): 1329-1352.
[15]崔松, 胡蓓, 陈荣秋. 时间竞争条件下的时间与成本关系研究. 中国工业经济, 2006(11): 76-82.
Cui Song, Hu Bei, Chen Rong-qiu. Research on the relationship of time & cost in time-based competitin[J]. China Industrial Economy, 2006(11): 76-82. |