[1]吴亚丽,张立香.资源受限项目调度的多智能体文化演化算法[J].系统工程,2010,28(2):9-16.
Wu Ya-li,Zhang Li-xiang. Multiagent cultural evolutionary algorithm for resource-constrained project scheduling[J]. System Engineering, 2010, 28(2):9-16.
[2]Zhang H. Particle swarm optimizationbased schemes for resourceconstrained project scheduling[J]. Automation in Construction, 2005, 14(3): 393-404.
[3]彭武良,郝永平.求解资源受限项目调度问题的改进粒子群算法[J].系统工程,2010,28(4):84-88.
Peng Wu-liang,Hao Yong-pin. An improved PSO for solving resource-constrained project scheduling problem[J]. System Engineering, 2010, 28(4):84-88.
[4]Hartmann S,Kolisch R. Experimental evaluation of state-of-the-art heuristics for the resource constrained project scheduling problem[J].European Journal of Operational Research, 2000, 127(2):394-407.
[5]Odile Bellenguez. Methods to solve multi-skill project scheduling problem[J]. A Quarterly Journal of Operation Research, 2008, 6(1):85-88.
[6]吕学志,曲长征,刘云赋,等.考虑柔性资源能力差异的项目调度问题[J].计算机工程与应用, 2011, 8(3):1-8.
Lü Xue-zhi, Qu Chang-zheng, Liu Yun-fu, et al. Project scheduling problem constrained by flexible resource with capability difference[J]. Computer Engineering and Applications, 2011, 8(3):1-8.
[7]白思俊,万小兵. 基于设计结构矩阵的项目进度周期[J].系统工程理论与实践,2008,11(28):51-54.
Bai Si-jun, Wan Xiao-bing. Project schedule cycle based on design structure matrix[J]. Systems EngineeringTheory & Practice, 2008, 11(28):51-54.
[8]Kennedy J,Eberhart R. Particle swarm optimization[C]∥Proceedings of IEEE International Conference on Neural Networks. New York:IEEE,1995,4:1942-1948
[9]Wang W C, Liu J J, Liao T S. Modeling of design iterations through simulation[J]. Automation in Construction,2006,15(5):589-603.
[10]王爱虎,杨曼丽. 基于设计结构矩阵的过程系统优化方法[J].工业工程,2005,6(8):71-76.
Wang Ai-Hu,Yang Man-li. Optimization of process system based on design structure matrix[J]. Industrial Engineering Journal, 2005, 6(8):71-76.
[11]郭云涛,白思俊,张静文.基于DSM的型号研制项目过程建模[J].航空制造技术,2009(3):75-79.
Guo Yun-tao,Bai Si-jun,Zhang Jing-wen. Modeling of model development project based on dependency structure matrix[J]. Aeronautical Manufacturing Technology, 2009(3):75-79.
[12]盛海涛,魏法杰.设计结构矩阵优化算法的研究与比较[J].计算机集成制造系统,2007,13(7):1255-1260.
Sheng Hai-tao,Wei Fa-jie. Design structure matrix optimization algorithms[J].Computer Integrated Manufacturing Systems, 2007, 13(7):1255-1260.
[13]Brucker P, et al. Resource-constrained project scheduling: notation, classification, models, and methods[J]. European Journal of Operational Research, 1999, 112(1): 3-41.
[14]Kolisch R. Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation[J]. European Journal of Operational Research, 1996, 90(2): 320-333.
[15]Shi Y, Eberhart R C. A Modified Particle Swarm Optimizer[C]. Proceedings of the IEEE World Congress on Computational Intelligence, 1998:69-73. |