Industrial Engineering Journal

Previous Articles    

Improvement and Evaluation of Electric Pump Assembly Production Line

  

  1. (Engineering and Technology College, Northeast Forestry University, Harbin 150040, China)
  • Online:2016-08-30 Published:2016-10-08

Abstract:

 As the production cost of products is increasingly emphasized by enterprises, the improvement of the production line has become a new focus in the business community. Taking the electric pump assembly production line as the research object, value analysis technique, "one-piece flow" technique and work study technique are used to analyze the existing problems in the production line. The improvement schemes of these three techniques are put forward. Then TOPSIS (technique for order preference by similarity to an ideal solution)and Grey Related Degree are used for evaluating the improvement schemes with the results of these three techniques compared. Finally the conclusion that "one-piece flow" technique is the best one to improve the enterprise's production line, then the work study, and last the value analysis, is drawn.

Key words: value analysis, one-piece flow, work study, improvement, evaluation