[1]HUSSAIN M A, AWASTHI A, TIWARI M K. Interpretive structural modelinganalytic network process integrated framework for evaluating sustainable supply chain management alternatives[J]. Applied Mathematical Modelling, 2016, 40(5-6):3671-3687.
[2]周荣辅, 朱超博.基于解释结构模型的供应链质量形成影响因素研究[J].科技管理研究,2012,(7):93-98.
ZHOU Rongfu, ZHU Chaobo. Study on factors affecting supply chain quality based on interpretative structural model[J]. Science and Technology Management Research, 2012,(7):93-98.
[3]ALIDRISI H. Prioritizing critical success factors for six sigma implementation using interpretive structural modeling[J]. American Journal of Industrial & Business Management, 2014, 4(12):697-708.
[4]ANSARI M F, KHARB R K, LUTHRA S, et al. Analysis of barriers to implement solar power installations in India using interpretive structural modeling technique[J]. Renewable & Sustainable Energy Reviews, 2013, 27(6):163-174.
[5]谢刚,李国平.广义梯度理论中梯度的解释结构模型研究[J].系统工程,2004,22(5):1-6.
XIE Gang, LI Guoping.An interpretive structure model on the grad in generalizedgrads theory[J]. Systems Engineering,2004, 22(5):1-6.
[6]李卫红.基于ISM的制造型企业品牌竞争力影响因素结构分析[J].数学的实践与认识,2014,14(13):63-71.
LI Weihong. Structural analysis of factors influencing brand competition capability in manufacturing enterprises based on interpretative structural model[J]. Mathematics in Practice and Theory, 2014,14(13):63-71.
[7]王凤山,朱万红,王全鹏.基于ISM的工程装备质量评价体系构建方法[J].解放军理工大学学报,2005,6(5):479-483.
WANG Fengshan, ZHU Wanhong, WANG Quanpeng. Constructing quality systems of engineering equipment based on ISM[J].Journal of PLA University of Science and Technology,2005,6(5):479-483.
[8]陈亚青,韩云祥.解释结构模型在航空事故分析中的应用[J].防灾科技学院学报,2009,11(2):4-6.
CHEN Yaqing, HAN Yunxiang. The application of interpretive structural model to air accident analysis[J]. Journal of Institute of Disaster Prevention Science and Technology,2010,30(1):309-311.
[9]林维,周丽莎.基于改进解释结构模型化方法的定位基准选择[J]. 计算机应用,2010,30(1):309-311.
LIN Wei, ZHOU Lisha. Selection of location datum based on improved interpretative structural modeling method[J]. Journal of Computer Applications, 2010, 30(1) : 309-311.
[10]丁力平,谭建荣,冯毅雄,等.基于解析结构模型的产品模块构建及其优化[J]. 计算机集成制造系统,2008,14(6): 1070-1077.
DING Liping, TAN Jianrong, FENG Yixiong, et al.Construction of product module based on interpretive structure modeling and its optimization[J]. Computer Integrated Manufacturing Systems.,2008,14(06): 1070-1077.
[11]张雷,刘志峰,杨明,等.基于解释结构模型的产品零部件拆卸序列规划[J].计算机辅助设计与图形学学报,2011,23(4):267-275.
ZHANG Lei, LIU Zhifeng, YANG Ming, et al. Disassembly sequence planning based on interpretative structural mode[J]. Journal of Computer Aided Design & Computer Graphics, 2011,23(4):267-275.
[12]ERTAS A, SMITH M W, TATE D, et al. Complexity of system maintainability analysis based on the interpretive structural modeling methodology: transdisciplinary approach[J]. Journal of Systems Science & Systems Engineering, 2016,25(2):254-268.
[13]汪邦军. 多特性工业过程质量诊断与控制[J]. 航空标准化与质量,2006(1): 14-18.
WANG Bangjun. Multivariate statistical process diagnosis & control[J]. Aeronautic Standardization & Quality,2006,(1):14-18.
[14]杜世昌,奚立峰,潘尔顺. 多阶段系统中尺寸偏差建模与控制[J].上海交通大学学报, 2006,40(4): 583-587.
DU Shichang, XI Lifeng, PAN Ershun. Modeling and controlling of dimensional variation in multistage manufacturing system[J].Journal of Shanghai Jiao Tong University,2006,40(4):583-587.
[15]LOOSE J P, ZHOU Q, ZHOU S, CEGLAREK D. Integrating GD&T into dimensional variation models for multistage machining processes[J]. International Journal of Production Research, 2010, 48(11): 3129-3149. |