[1] 周锦昌, 钟昀泰, 林国恩. 科技之巅——站在顶端的中国数字消费者2018中国移动消费者调研-德勤[EB/OL]. (2019-01-25). https://www2.deloitte.com/cn/zh/pages/technology-media-and-telecommunicati-ons/articles/2018-deloitte-china-mobile-consumer-survey.html. [2] WU S. A failure process model with the exponential smoothing of intensity functions[J]. European Journal of Operational Research, 2019, 275(2): 502-513 [3] 戴安舒, 魏冠州, 何曙光, 等. 二维质保管理研究综述与展望[J]. 工业工程, 2019, 22(6): 96-102,117 DAI Anshu, WEI Guanzhou, HE Shuguang, et al. Two dimensional warranty management review and research prospect[J]. Industrial Engineering Journal, 2019, 22(6): 96-102,117 [4] 程中华, 杨志远, 杨红兵. 预防性维修下装备二维保修策略优化模型[J]. 工业工程, 2017, 20(4): 79-86,100 CHENG Zhonghua, YANG Zhiyuan, YANG Hongbing. An optimization model for two-dimensional warranty policy of equipment under preventive maintenance[J]. Industrial Engineering Journal, 2017, 20(4): 79-86,100 [5] 董克, 吕文元. 旧设备租赁的周期预防维护策略优化[J]. 工业工程, 2015, 18(5): 14-19 DONG Ke, LYU Wenyuan. Optimal periodic preventive maintenance policy for used equipment under lease[J]. Industrial Engineering Journal, 2015, 18(5): 14-19 [6] LUO M, WU S. A value-at-risk approach to optimisation of warranty policy[J]. European Journal of Operational Research, 2018, 267(2): 513-522 [7] CHEN C, LO C, WENG T. Optimal production run length and warranty period for an imperfect production system under selling price dependent on warranty period[J]. European Journal of Operational Research, 2017, 259(2): 401-412 [8] XIE W, YE Z. Aggregate discounted warranty cost forecast for a new product considering stochastic sales[J]. IEEE Transactions on Reliability, 2016, 65(1): 486-499 [9] GUO J, SHEN Y, LU Z, et al. Reliability modeling for consecutive k-out-of-n: F systems with local load-sharing components subject to dependent degradation and shock processes[J]. Quality and Reliability Engineering International, 2020, 36: 1553-1569 [10] LUO M, WU S. A mean-variance optimisation approach to collectively pricing warranty policies[J]. International Journal of Production Economics, 2018, 196: 101-112 [11] FERNANDEZ A, STOL N. Economic, dissatisfaction, and reputation risks of hardware and software failures in PONs[J]. IEEE/ACM Transactions on Networking, 2017, 25(2): 1119-1132 [12] LUO M, WU S. A comprehensive analysis of warranty claims and optimal policies[J]. European Journal of Operational Research, 2019, 276(1): 144-159 [13] PATANKAR J G, MITRA A. Effects of warranty execution on warranty reserve costs[J]. Management Science, 1995, 41(3): 395-400 [14] WANG X, YE Z S, HONG Y, et al. Analysis of field return data with failed-but-not-reported events[J]. Technometrics, 2018, 60(1): 90-100 [15] LIAO H T, XIE W. Warranty repair demand prediction considering new sales and failed-but-not-reported phenomena[C/OL]. (2012-06-26). https://arizona.pure.elsevier.com/en/publications/warranty-repair-demand-prediction-considering-new-sales-and-faile. [16] WANG X, XIE W. Aggregate discounted warranty cost forecasting considering the failed-but-not-reported events[J]. Reliability Engineering & System Safety, 2017, 168: 355-364 [17] WU S. Warranty claim analysis considering human factors[J]. Reliability Engineering & System Safety, 2011, 96(1): 131-138 [18] GORDON B R. A dynamic model of consumer replacement cycles in the PC processor[J]. Industry Marketing Science, 2009, 28(5): 846-867 [19] YAZDIAN S A, SHAHANAGHI K, MAKUI A. Joint optimisation of price, warranty and recovery planning in remanufacturing of used products under linear and non-linear demand, return and cost functions[J]. International Journal of Systems Science, 2014, 47(5-8): 1155-1175 [20] 艾瑞咨询. 2018年中国人工智能手机行业研究报告[EB/OL]. (2018-12-18). http://report.iresearch.cn/report.pdf.aspx?id=3312. [21] 李彦蓉. 消费类电子产品生命周期末期质保政策的设计与优化[D]. 天津:天津大学, 2018. LI Yanrong. Determination and optimization of warranty service method of the consumer electronics during the end of life time[D]. Tianjin: Tianjin University, 2018. [22] KANSAL Y, SINGH G, KUMAR U, et al. Optimal release and patching time of software with warranty[J]. International Journal of System Assurance Engineering and Management, 2016, 7: 462-468
|