[1]ASCE.Quality in the constructed project:A guide for owners,designers and constructors[R].Reston,Virginia:American Society of Civil Engineers,2000.
[2]Blayse A M,Manley K.Key influences on construction innovation[J].Construction Innovation,2004,4(3):143154.
[3]Love P E D.Influence of project type and procurement method on rework costs in building construction projects[J].Journal of Construction Engineering and Management,2002,128(1):1829.
[4]Chan A P C,Scott D,Chan A P L.Factors affecting the success of a construction project[J].Journal of Construction Engineering and Management,2004,130(1):153155.
[5]Cheung S O,Lam T I,Leung M Y,et al.An analytical hierarchy process based procurement selection method[J].Construction Management and Economics,2001,19(4):427437.
[6]Ling F Y Y,Chan S L,Chong E,et al.Predicting performance of designbuild and designbidbuild projects[J].Journal of Construction Engineering and Management,2004,130(1):7583.
[7]Chan A P C,Ho D C K,Tam C M.Design and build project success factors:multivariate analysis[J].Journal of Construction Engineering and Management,2001,127(2):93100.
[8]Khalil M I A L.Selecting the appropriate project delivery method using AHP[J].International Journal of Project Management,2002,20(6):469474.
[9]Mahdi I M,Alreshaid K.Decision support system for selecting the proper project delivery method using analytical hierarchy process(AHP)[J].International Journal of Project Management,2005,23(7):564572.
[10]洪伟民,王卓甫.基于SMARTS的工程交易方式决策分析[J].生态经济:学术版,2007(10):3437.
[11]王学通,王要武.基于不确定多属性理论的总承包工程交易模式决策模型研究[J].中国软科学,2010(2):153160.
[12]王学通,王要武.总承包工程交易模式决策UMADM支持模型[J].广州大学学报:自然科学版,2009,8(6):8286.
[13]戴跃强,徐泽水,李琰,等.语言信息评估新标度及其应用[J].中国管理科学,2008,16(2):145149.
[14]Xu Zeshui.A direct approach to group decision making with uncertain additive linguistic preference relations[J].Fuzzy Optimization and Decision Making,2006,5(1):2132.
[15]徐泽水,达庆利.区间数排序的可能度法及其应用[J].系统工程学报,2003,18(1):6770.
[16]Lo T Y,Fung I W H,Tung K C F.Construction delays in Hong Kong civil engineering projects[J].Journal of Construction Engineering Management,ASCE,2006,132(6):636649.
[17]Okpala D C,Aniekwu A N.Causes of high costs of construction in Nigeria[J].Journal of Construction Engineering Management,ASCE,1988,114(2):233244.
[18]Xu Zeshui,Da Qingli.Linguistic approaches to multiple attribute decision making in uncertain linguistic setting[J].Journal of Southeast University,2004,20(4):482485.
[19]Yager R R.Families of OWA operators[J].Fuzzy Sets and Systems,1993,59(2):125148. |