[1]Axster S. Inventory control[M]. New York: Springer Verlag, 2006.
[2]Hsu W L. On the general feasibility test of scheduling lot sizes for several products on one machine[J]. Management Science. 1983, 29(1): 93-105.
[3]吴丽娜,周支立,汪应洛. 经济批量排产问题的研究方法综述[J]. 中国机械工程, 2006, 17(增刊): 186-191.
Wu Lina, Zhou Zhili, Wang Yingluo. Literature review of economic lot scheduling problem[J]. China Mechanical Engineering, 2006, 17: 186-191.
[4]李天凤,周支立,吴丽娜. 经济批量排产问题的一种排产方法[J]. 管理学报, 2007, 4(4): 384392.
Li Tianfeng, Zhou Zhili, Wu Lina. A scheduling algorithm for economic lot schedulings[J]. Chinese Journal of Management, 2007, 4(4): 384392.
[5]Giri B C, Moon I. Note on an economic lot scheduling problem under budgetary and capacity constraints[J]. International Journal of Production Economics, 2004, 91(3): 229234.
[6]Torabi S A, Karimi B, Fatemi Ghomi S. The common cycle economic lot scheduling in flexible job shops:the finite horizon case[J]. International Journal of Production Economics, 2005, 97(1): 52-65.
[7]Lin G C, Kroll D E, Lin C J. Determining a common production cycle time for an economic lot scheduling problem with deteriorating Items[J]. European Journal of Operational Research, 2006, 173(2): 669-682.
[8]Hahm J, Yano C A. The economic lot and delivery scheduling problem:the common cycle case[J].IIE Transactions, 1995, 27(2): 113-125.
[9]Khouja M. The economic lot and delivery scheduling problem: common cycle, rework, and variable production rate[J]. IIE Transactions, 2000, 32(8): 715-725.
[10]Vergara F E, Khouja M, Michalewicz Z. An evolutionary algorithm for optimizing material flow in supply chains[J]. Computers & Industrial Engineering, 2002, 43(3): 407-421.
[11]Khouja M. Synchronization in supply chains: implications for design and management[J]. Journal of The Operational Research Society, 2003, 54(9): 984-994.
[12]Jensen M T, Khouja M. An optimal polynomial time algorithm for the common cycle economic lot and delivery scheduling problem[J]. European Journal of Operational Research, 2004, 156(2): 305-311.
[13]Clausen J, Ju S Q. A hybrid algorithm for solving the economic lot and delivery scheduling problem in the common cycle case[J]. European Journal of Operational Research, 2006, 175(2): 1141-1150.
[14]Torabi S A, Ghomi S, Karimi B. A hybrid genetic algorithm for the finite horizon economic lot and delivery scheduling in supply chains[J]. European Journal of Operational Research, 2006, 173(1): 173-189.
[15]Torabi S A, Jenabi M. Multiple cycle economic lot and deliveryscheduling problem in a twoechelon supply chain[J]. International Journal of Advanced Manufacturing Technology, 2009, 43(7-8): 785-798.
[16]张燕,周支立. 供应链中的多目标经济批量排产和运送问题的求解[J]. 运筹与管理, 2009, 18(1): 34-41.
Zhang Yan, Zhou Zhili. Multiobjective economic lot and delivery scheduling problem in supply chain[J]. Operations Research and Management Science, 2009, 18(1): 34-41.
[17]Cachon G P. Supply chain coordination with contracts[M]. Handbooks in Operations Research and Management Science Vol. 11: Supply Chain Management: Design, Coordination and Operation, de Kok A G, Graves S C(eds),Amsterdam Elsevier, 2003:229-340.
[18]Cachon G P, Lariviere M A. Supply chain coordination with revenuesharing contracts: strengths and limitations[J]. Management Science, 2005, 51(1): 30-34.
[19]Pinedo M. Scheduling: Theory, Algorithms, and Systems[M]. New York: SpringerVerlag, 2008. |