[1]朱海平,赵玉,吴军,等.神经网络集成方法在产品完工期预测中的应用[J].计算机集成制造系统,2007,13(11):2140-2144.
Zhu Haiping,Zhao Yu,Wu Jun,et al.Application of neural network ensemble in prediction of product due date[J].Computer Integrated Manufacturing Systems,2007,13(11): 2140-2144.
[2]张毕西,谢祥添. 基于BP神经网络多品种、小批量、订单式的生产交货期预测问题研究[J].价值工程,2007,26(8):11-13.
Zhang Bixi,Xie Xiangtian.Produced delivery date forecast problems studying about multiple products small lot order form basing on BP neural networks[J].Value Engineering,2007,26(8):11-13.
[3]Timothy L.Establishing delivery guarantee policies[J].European Journal of Operational Research,2009,196(3):959-967.
[4]Charnsirisakskul,Griffin P M,Keskinka K P.Order selection and scheduling with leadtime flexibility[J].IIE Transactions,2004,36(7):697-707.
[5]Charnsirisakskul,Griffin P M,Keskinka K P.Pricing and scheduling with leadtime flexibility[J].European Journa1 of Operation Research,2006,171(1):153-169.
[6]Hill A V, Hays J M,Naveh E A.Model for optimal delivery time guarantees[J].Journal of Service Research ,2000,2(3):254-260.
[7]Duenyas I.Single facility due date setting with multiple customer classes[J].Management Science,1999,41(3):60-619.
[8]So Kut C,Song JingSheng.Price,delivery time guarantees and capacity selection[J].European Journal of Operational Research,1998,94(3):28-49.
[9]祝勇,潘晓弘,王正肖.基于优先准则的电子产品订货交货期决策[J].计算机工程与应用,2010,46(5):10-12,39.
Zhu Yong,Pan Xiaohong,Wang Zhengxiao.Deliverydate dedision of electronic products orders for multiple assembly lines based on priority rule[J].Computer Engineering and Application,2010,46(5):1012,39.
[10]林泽安,陈庆新,毛宁,等.运用半Markov与能力验证的模具企业订单交货期设置[J].工业工程,2010,13(4):74-80.
Lin Zean,Chen Qingxin,Mao Ning,et al.Reliable due date setting in mold manufacturing based on semi-markov process and capacity checking[J]. Industrial Engineering Journal,2010,13(4):74-80.
[11]倪卫涛,周晶.MTO生产模式的交货期决策模型及其分析[J].工业工程,2008,11(2):54-55.
Ni Weitao,Zhou Jing.Delivery time model and its analysis based on MTO manufacturing mode[J].Industrial Engineering Journal, 2008,11(2):5455.
[12]钟永佳.半导体制造业订单交货期预测的研究[D].上海:同济大学,2008.
Zhong Yongjia.Research about deliverydate predition of semiconductor manufacturing[D]. Shanghai:Tongji University,2008。
[13]聂兰顺,徐晓飞,站德臣.MTO型供应链的价格/交货期协商支持模型[J].信息与控制,2007,36(2):129-135.
Nie Lanshun,Xu Xiaofei,Zhan Dechen.Model for supporting the price and due date negotiation in MTO supply chain[J].Information and Control, 2007,36(2):129-135.
[14]林勇,乐晓娟,于建红.基于生产能力的价格与交货期协调决策模型[J].工业工程与管理,2006,11(5):18-19.
Lin Yong,Le XiaoJuan,Yu Jianhong.A study on delivery time and price coordination decision based on production capacity[J].Industrial Engineering and Management,2006,11(5):18-19.
[15]张毕西,周艳,赵伟.订货生产式企业作业任务交货期决策研究[J].工业工程,2004,7(1):26-28.
Zhang Bixi,Zhou Yan,Zhao Wei.Duedate assignments for maketoorder enterprises[J]. Industrial Engineering Journal, 2004,7(1):26-28. |