[1]齐二石,程文明.丰田生产方式评价指标体系的建立及其应用研究[J].科学学与科学技术管理,2005(4):141-144.
Qi Er-shi,Cheng Wen-ming. Study on establishment and application of TPS evaluation system [J].Science of Science and Management of S&T,2005(4):141-144.
[2]孟飚,范玉清,林楠. 模块化精益生产组织改造评估与决策[J]. 计算机集成制造系统,2006,12(7):1141-1145.
Meng Biao,Fan Yu-qing, Lin Nan. Evaluation & decision-making for organization reconstruction based on modular lean production[J]. Computer Integrated Manufacturing System, 2006,12(7):1141-1145.
[3]蔺宇.TPS的过程成本控制与评价方法研究[D].天津:天津大学,2007.
Lin Yu. Study on process cost control and evaluation method of TPS[D]. Tianjin:Tianjin University, 2007.
[4]周海波.基于DEA的丰田生产方式评价体系研究[D].天津:天津大学,2007.
Zhou Hai-bo. Evaluation system of TPS based on DEA[D]. Tianjin:Tianjin University,2007.
[5]Mark Huson, Dhananjay Nanda.The impact of just-in-time manufacturing on firm performance in the US[J].Journal of Operations Management ,1995,12(3):297-310.
[6]Jeffrey L, Callen, Chris Fader, Itzhak Krinsky.Just-in-time: a cross-sectional plant analysis [J]. International Journal of Production Economics, 2000,63(3):277-301.
[7]Rosemary R,Fullerton, Cheryl S,et al.The role of performance measures and incentive system in relation to the degree of JIT implementation [J].Accounting Organization and Society, 2002,27(8):711-735.
[8]Leonardo Rivera, Chen F Frank. Measuring the impact of Lean tools on the cost-time investment of a product using cost-time profiles[J].Robotics and Computer-integrated Manufacturing,2007,23(6):684-689.
[9]Bayou M E, Korin A de. Measuring the leanness of manufacturing systems-a case study of Ford Motor Company and General Motors[J].Journal of Engineering and Technology Management, 2008,25(4): 287-304.
[10]徐国兵,张文杰.基于网络层次分析法的物流外包满意度评价方法研究[J].南开经济研究,2007(5):120-132.
Xu Guo-bing, Zhang Wen-jie. Comprehensive evaluation method of satisfaction for logistic outsourcing based on ANP[J]. Nankai Economic Studies, 2007(5):120-132.
[11]刘伟华,周丽珍,刘春玲,等.基于网络层次分析法的物流服务供应链综合绩效评价[J].工业工程,2011,14(4):52-57.
Liu Wei-hua, Zhou Li-zhen, Liu Chun-ling, et al.ANP-based comprehensive performance evaluation of logistics service process[J]. Industrial Engineering Journal,2011,14(4):52-57.
[12]胡晓雪,杨晓华,郦建强,等.河流健康系统评价的集对分析模型[J].系统工程理论与实践,2008(5):164-170.
Hu Xiao-xue, Yang Xiao-hua, Li Jian-qiang, et al.Set pair analysis model for river health system assessment[J]. System Engineering-Theory & Practice,2008(5):164-170.
[13]杨俊杰, 周建中, 方仍存, 等. 基于集对分析的不确定多属性决策方法[J].控制与决策,2008,23(12):1423-1426.
Yang, Jun-jie, Zhou Jian-zhong, Fang Reng-cun,et al. Uncertain multiattribute decision making methods based on set pair analysis[J]. Control and Decision, 2008,23(12):1423-1426.
[14]杨瑞刚,吕明,徐格宁,等.基于未确知理论的机械结构能度可靠性方法[J].四川大学学报:工程科学版,2008,40(6):170-175.
Yang Rui-gang, Lü Ming, Xu Ge-ning, et al. Possibilistic reliability methods for the mechanical structure based on unascertained theory[J].Journal of Sichuan University:Engineering Edition, 2008,40(6):170-175.
[15]张永强,孙胜娟. 基于未确知理论的软件可靠性建模[J].软件学报, 2006,17(8): 1681-1687.
Zhang Yong-qiang, Sun Sheng-juan. Software reliability modeling based on uncertain theory[J]. Journal of Software, 2006,17(8): 1681-1687. |