[1] PONGPECH J, MURTHY D. Optimal periodic preventive maintenance policy for leased equipment[J]. Reliability Engineering & System Safety, 2006, 91(7):772-777. [2] SCHUTZ J, REZG N. Maintenance strategy for leased equipment[J]. Computers & Industrial Engineering, 2013, 66(3):593-600. [3] JATURONNATEE J, MURTHY D N P, BOONDISKULCHOK R. Optimal preventive maintenance of leased equipment with corrective minimal repairs[J]. European Journal of Operational Research, 2006, 174(1):201-215. [4] HUNG W T, TSAI T R, CHANG Y C. Periodical preventive maintenance contract for leased equipment with random failure penalties[J]. Computers & Industrial Engineering, 2017, 113(11):437-444. [5] REZG N, HAJEJ Z, BOSCHIAN-CAMPANER V. A decision optimization model for leased manufacturing equipment with warranty for a production-maintenance forecasting problem[M]. New York:Hindawi Publishing Corporation, 2015:95-124. [6] 金琳, 王燕, 周晓军. 基于虚拟年龄的租赁设备预防性维护策略研究[J]. 工业工程与管理, 2013, 18(06):68-72+78. JIN Lin, WANG Yan, ZHOU Xiaojun. Research on virtual age based preventive maintenance policy for leased equipment[J]. Industrial Engineering and Management, 2013, 18(06):68-72+78. [7] ISKANDAR B P, HUSNIAH H. Optimal preventive maintenance for a two dimensional lease contract[J]. Computers & Industrial Engineering, 2017, 113(9):693-703. [8] ZHOU X, WU C, LI Y, et al. A preventive maintenance model for leased equipment subject to internal degradation and external shock damage[J]. Reliability Engineering & System Safety, 2016, 154(10):1-7. [9] MABROUK A B, CHELBI A, RADHOUI M. Optimal imperfect maintenance strategy for leased equipment[J]. International Journal of Production Economics, 2016, 178(8):57-64. [10] 金琳, 黄开敏, 周晓军. 租赁设备的多阶段预防性维护策略及优化[J]. 计算机集成制造系统, 2013, 19(12):2947-2953. JIN Lin, HUANG Kaimin, ZHOU Xiaojun. Multi-period preventive maintenance policy and optimization for leased equipment[J]. Computer Integrated Manufacturing Systems, 2013, 19(12):2947-2953. [11] 董克, 吕文元. 考虑租赁延迟的设备预防维护策略优化研究[J]. 工业工程与管理, 2016, 21(01):60-66. DONG Ke, LYU Wenyuan. Optimal preventive maintenance policy for leased equipment considering lease delay[J]. Industrial Engineering and Management, 2016, 21(01):60-66. [12] 张耀辉, 郭金茂, 徐宗昌, 等. 基于故障风险的状态维修检测间隔期的确定[J]. 中国机械工程, 2008, 19(5):555-558. ZHANG Yaohui, GUO Jinmao, XU Zongchang, et al. Failure risk based determination of the test intervals for condition based maintenance[J]. China Mechanical Engineering, 2008, 19(5):555-558. [13] 董克, 吕文元. 基于历史故障数据的租赁设备预防维护策略优化[J]. 运筹与管理, 2017, 26(5):119-124. DONG Ke, LYU Wenyuan. Optimal periodic preventive maintenance policy for leased equipment based on history failure data[J]. Operations Research and Management Science, 2017, 26(5):119-124. |