[1] 王佳, 黄秀蓉. 废旧动力电池的危害与回收[J]. 生态经济, 2021, 37(12): 5-8 [2] 周媛, 信天, 王鑫, 等. 动力电池梯次利用标准化现状探讨[J]. 电池, 2021, 51(5): 534-537 ZHOU Yuan, XIN Tian, WANG Xin, et al. Discussion on current situation of power battery echelon utilization standardization[J]. Battery Bimonthly, 2021, 51(5): 534-537 [3] 李敬, 杜刚, 殷娟娟. 退役电池回收产业现状及经济性分析[J]. 化工学报, 2020, 71(S1): 494-500 LI Jing, DU Gang, YIN Juanjuan. Current situation and economic analysis of waste battery recycling industry[J]. CIESC Journal, 2020, 71(S1): 494-500 [4] 李靖, 华林, 郭巍, 等. 退役乘用车回收拆解与资源化工艺流程评价分析[J]. 合肥工业大学学报 (自然科学版), 2015, 38(6): 726-732 LI Jing, HUA Lin, GUO Wei, et al. Evaluation analysis of retrieving, dismantling and recycling process of retired passenger vehicles[J]. Journal of Hefei University of Technology (Natural Science), 2015, 38(6): 726-732 [5] 张春亮. 不确定条件下退役乘用车拆解深度决策与产线平衡优化研究[D]. 上海: 上海交通大学, 2019. ZHANG Chunliang. Research on the disassembly depth and the balancing and optimization of disassembly line on end-of-life passenger cars under uncertainty[D]. Shanghai: Shanghai Jiao Tong University, 2019. [6] 蒋京呈, 菅小东, 林军, 等. 锂动力电池产业有毒有害物质筛查及对策研究[J]. 环境污染与防治, 2021, 43(6): 801-806 JIANG Jingcheng, JIAN Xiaodong, LIN Jun, et al. Research on screening and countermeasures of toxic and hazardous substances in lithium power battery[J]. Environmental Pollution & Control, 2021, 43(6): 801-806 [7] TAO S, DONG Z S. Scheduling resource-constrained project problem with alternative activity chains[J]. Computers & Industrial Engineering, 2017, 114: 288-296 [8] ZHANG L, YU C, WONG T N. et al. A graph-based constraint programming approach for the integrated process planning and scheduling problem[J]. Computers & Operations Research, 2021, 131: 105282 [9] 蒋胜龙, 郑忠. 考虑不确定加工时间的炼钢—连铸过程柔性调度方法[J]. 计算机集成制造系统, 2019, 25(1): 103-114 JIANG Shenglong, ZHENG Zhong. Flexible scheduling approach for steelmaking-continuous casting process with uncertain processing times[J]. Computer Integrated Manufacturing Systems, 2019, 25(1): 103-114 [10] AMIRI M F, BEHNAMIAN J. Multi-objective green flowshop scheduling problem under uncertainty: estimation of distribution algorithm[J]. Journal of Cleaner Production, 2020, 251: 119734 [11] 姜天华. 基于灰狼优化算法的低碳车间调度问题[J]. 计算机集成制造系统, 2018, 24(10): 2428-2435 JIANG Tianhua. Low-carbon workshop scheduling problem based on grey wolf optimization[J]. Computer Integrated Manufacturing Systems, 2018, 24(10): 2428-2435 [12] LIU Z, WANG J, ZHANG C, et al. A hybrid genetic-particle swarm algorithm based on multilevel neighbourhood structure for flexible job shop scheduling problem[J]. Computers & Operations Research, 2021, 135: 105431 [13] 张晓星, 王艳, 严大虎, 等. 改进的混合蛙跳算法求解柔性作业车间调度[J]. 系统仿真学报, 2017, 29(9): 2093-2099 ZHANG Xiaoxing, WANG Yan, YAN Dahu, et al. Improved shuffled frog-leaping algorithm for solving flexible job shop scheduling problem[J]. Journal of System Simulation, 2017, 29(9): 2093-2099 [14] SAJID M, MITTAL H, PARE S, et al. Routing and scheduling optimization for UAV assisted delivery system: a hybrid approach[J]. Applied Soft Computing, 2022, 126: 109225 [15] KURDI M. A memetic algorithm with novel semi-constructive evolution operators for permutation flowshop scheduling problem[J]. Applied Soft Computing, 2020, 94: 106458 [16] ZAROUK Y, MAHDAVI I, REZAEIAN J, et al. A novel multi-objective green vehicle routing and scheduling model with stochastic demand, supply, and variable travel times[J]. Computers & Operations Research, 2022, 141: 105698 [17] 胡士娟, 鲁海燕, 向蕾, 等. 求解MMTSP的模糊聚类单亲遗传算法[J]. 计算机科学, 2020, 47(6): 219-224 HU Shijuan, LU Haiyan, XIANG Lei, et al. Fuzzy c-means clustering based partheno-genetic algorithm for solving MMTSP[J]. Computer Science, 2020, 47(6): 219-224 [18] 王宁, 胡大伟, 徐杰, 等. 基于客户价值和满意度的城市冷链物流时变路径问题[J]. 中国公路学报, 2021, 34(9): 297-308 WANG Ning, HU Dawei, XU Jie, et al. Time-dependent vehicle routing of urban cold-chain logistics based on customer value and satisfaction[J]. China Journal of Highway and Transport, 2021, 34(9): 297-308
|