[1] TSUNG F, WANG K B. Adaptive charting techniques:literature review and extensions[J]. Frontiers in Statistical Quality Control, 2010, 9:19-31. [2] ZHANG P W, SU Q, LI C, WANG T. An economically designed sequential probability ratio test control chart for short-run production[J]. Computers and Industrial Engineering, 2014, 78:74-83. [3] LIU L, CHEN B, ZHANG J, et al. Adaptive phase Ⅱ nonparametric EWMA control chart with variable sampling interval[J]. Quality and Reliability Engineering International, 2015, 31(1):15-26. [4] NENES G, TASIAS K A, CELANO G. A general model for the economic-statistical design of adaptive control charts for processes subject to multiple assignable causes[J]. International Journal of Production Research, 2015, 53(7):2146-2164. [5] 张鹏伟, 苏秦, 王甜甜. 小批量生产过程VSI控制图经济设计[J]. 系统工程理论与实践, 2013, 33(5):1185-1191. ZHANG Pengwei, SU Qin, WANG Tiantian. Economic design of VSI control chart for short-run production[J]. System Engineeriing-Theory & Practice, 2013, 33(5):1185-1191. [6] PHAM H, WANG W. Imperfect maintenance[J]. European Journal of Operational Research, 1996, 94(3):425-438. [7] LIU Y, HUANG H Z, WANG Z L, et al. A joint redundancy and imperfect Maintenance strategy optimization for multi-state systems[J]. IEEE Transactions on Reliability, 2013, 62(2):368-378. [8] LE M D, TAN C M. Optimal maintenance strategy of deteriorating system under imperfect maintenance and inspection using mixed inspection scheduling[J]. Reliability Engineering and System Safety, 2013, 113:21-29. [9] PASCUAL R, GODOY D, FIGUEROA H. Optimizing maintenance service contracts under imperfect maintenance and a finite time horizon[J]. Applied Stochastic Models in Business and Industry, 2013, 29(5):564-577. [10] ZHAO Y, VOLOVOI V, WATERS M. A sequential approach for gas turbine power plant preventive maintenance schedu-ling[J]. Transactions of the ASME, 2005, 128(4):796-805. [11] SUN Y, MA L, MORRIS J. A practical approach for reliability prediction of pipeline systems[J]. Transactions of the ASME, 2009, 198(1):210-214. [12] 董克, 吕文元. 旧设备租赁的周期预防维护策略优化[J]. 工业工程, 2015, 18(5):14-19. DONG Ke, LYU Wenyuan. Optimal periodic preventive maintenance policy for used equipment under lease[J]. Industrial Engineering, 2015, 18(5):14-19. [13] XIA T, XI L, ZHOU X. Modeling and optimizing maintenance schedule for energy systems subject to degradation[J]. Computers and Industrial Engineering, 2012, 63(3):607-614. [14] PANAGIOTIDOU S, TAGARAS G. Statistical process control and condition-based maintenance:a meaningful relationship through data sharing[J]. Production and Operations Management, 2010, 19(2):156-171. [15] YIN Z J, MAKIS V. Economic and economic-statistical design of a multivariate Bayesian control chart for condition-based maintenance[J]. IMA Journal of Management Mathematics, 2011, 22:47-63. [16] XIANG Y S. Joint optimization of X control chart and preventive maintenance policies:A discrete-time Markov chain appr-oach[J]. European Journal of Operational Research, 2013, 229(2):382-390. [17] YU F J, CHENG S S, YANG C H, et al. The economic-rtatistical design of x control charts under preventive maintenance[J]. Management Science and Engineering, 2014, 3(1):7-12. [18] DE MAGALHAES M S, EPPRECHT E K, COSTA A F B. Economic design of a Vp chart[J]. International Journal of Production Economics, 2001, 74(1-3):191-200. [19] NENES G. A new approach for the economic design of fully adaptive control charts[J]. International Journal of Production Economics, 2011, 131(2):631-642. |