[1] 周蓉, 沈维蕾. 装卸一体化车辆路径问题的自适应并行遗传算法[J]. 中国机械工程, 2018, 29(22): 2740-2749 ZHOU Rong, SHEN Weilei. An adaptive parallel genetic algorithm for VRPSPD[J]. China Mechanical Engineering, 2018, 29(22): 2740-2749 [2] 凌琳, 刘明周, 葛茂根, 等. 计及漂移瓶颈的时变物料配送路径优化[J]. 机械工程学报, 2015, 51(23): 133-143 LING Lin, LIU Mingzhou, GE Maogen, et al. Time-varying material distribution routing optimization considering shifting bottleneck[J]. Journal of Mechanical Engineering, 2015, 51(23): 133-143 [3] 夏扬坤, 符卓, 谢九勇. 依订单拆分的多自动导引车物料配送路径规划[J]. 计算机集成制造系统, 2017, 23(7): 1520-1528 XIA Yangkun, FU Zhuo, XIE Jiuyong. Material distribution route planning for multiple automated guided vehicles with split deliveries by order[J]. Computer Integrated Manufacturing Systems, 2017, 23(7): 1520-1528 [4] ZHANG Y, ZHANG G, DU W, et al. An optimization method for shopfloor material handling based on real-time and multisource manufacturing data[J]. International Journal of Production Economics, 2014, 165: 282-292 [5] 严正峰, 梅发东, 葛茂根, 等. 基于模糊软时间窗的车间物料流路径优化方法[J]. 计算机集成制造系统, 2015, 21(10): 2760-2767 YAN Zhengfeng, MEI Fadong, GE Maogen, et al. Path optimization method of workshop logistics based on fuzzy soft time windows[J]. Computer Integrated Manufacturing Systems, 2015, 21(10): 2760-2767 [6] GUPTA S, ALI I, AHMED A. Multi-choice multi-objective capacitated transportation problem - a case study of uncertain demand and supply[J]. Journal of Statistics and Management Systems, 2018, 21(3): 467-491 [7] MIN H. The multiple vehicle routing problems with simultaneous delivery and pick-up points[J]. Transportation Research, Part a: General, 1989, 23(5): 377-386 [8] 王科峰, 叶春明, 唐国春. 节点具有双重需求的车辆路径问题及其性质[J]. 系统科学与数学, 2011, 31(10): 1185-1196 WANG Kefeng, YE Chunming, TANG Guochun. Vehicle routing problem with nodes with dual requirements and its properties[J]. Journal of Systems Science and Mathematical Sciences, 2011, 31(10): 1185-1196 [9] TANG A S, GEN M. A genetic algorithm based approach to vehicle routing problem with simultaneous pick-up and deliveries[J]. Computers and Industrial Engineering, 2012, 62(3): 755-761 [10] WANG H F, CHEN Y Y. A genetic algorithm for the simultaneous delivery and pickup problems with time window[J]. Computers and Industrial Engineering, 2012, 62(1): 84-95 [11] CARVALHO N, CHAIM O, CAZARINI E, et al. Manufacturing in the fourth industrial revolution: a positive prospect in Sustainable Manufacturing[J]. Procedia Manufacturing, 2018, 21: 671-678 [12] 姚勇, 李少波, 张成龙. 基于PSO算法的离散制造车间物料供应路径优化[J]. 组合机床与自动化加工技术, 2018(3): 154-156,160 YAO Yong, LI Shaobo, ZHANG Chenglong. Optimization of material supply path for discrete manufacturing shop based on PSO algorithm[J]. Modular Machine Tools and Automatic Manufacturing Technique, 2018(3): 154-156,160 [13] KOREN Y, GU X, BADURDEEN F, et al. Sustainable living factories for next generation manufacturing[J]. Procedia Manufacturing, 2018, 21: 26-36 [14] 陆志强, 曾浚. 飞机移动生产线物料配送与空箱回收集成建模[J]. 同济大学学报(自然科学版), 2019, 47(1): 136-142 LU Zhiqiang, ZENG Jun. Integrated modeling of material delivery and container pick up problem for aircraft moving assembly line[J]. Journal of Tongji University (Natural Science), 2019, 47(1): 136-142 [15] 蒋磊. 基于物联网的离散制造车间物料管理方法的研究[D]. 南京: 南京航空航天大学, 2013. JIANG Lei. Research of material management method for discrete workshop based on internet of things[D]. Nanjing: Nanjing University of Aeronautics and Astronautics, 2013. [16] 陆志强, 胡鑫铭, 杜鑫. 物料配送与线边存储集成决策模型与算法[J]. 浙江大学学报(工学版), 2018, 52(7): 1354-1363 LU Zhiqiang, HU Xinming, DU Xin. Integrated modeling and algorithm of material delivery and line-side storage problem[J]. Journal of Zhejiang University(Engineering Science), 2018, 52(7): 1354-1363 [17] BANOS R, ORTEGA J, GIL C, et al. A simulated annealing-based parallel multi-objective approach to vehicle routing problems with time windows[J]. Expert Systems with Applications, 2013, 40(5): 1696-1707 [18] 陈广胜, 董宝力. 基于改进遗传算法的物料配送多目标优化模型研究[J]. 现代制造工程, 2017(7): 114-120 CHEN Guangsheng, DONG Baoli. Research on material distribution multi-objective optimization model based on improved genetic algorithm[J]. Modern Manufacturing Engineering, 2017(7): 114-120
|