[1]Huemann M, Keegan A, Turner J R. Human resource management in the projectoriented company: A review[J]. International Journal of Project Management, 2007, 25(3):315-323.
[2]Heimerl C, Kolisch R. Scheduling and staffing multiple projects with a multiskilled workforce[J]. OR Spectrum,2010, 32(2):343-368.
[3]Haitao L, Keith W. Scheduling projects with multiskilled personnel by a hybrid MILP/CP benders decomposition algorithm[J].Journal of Scheduling,2009,12(3):281-298.
[4]王一帆. 多技能人力资源约束下项目优化调度方法研究[D].沈阳:东北大学,2011.
Wang Yi-fan. Resource on project scheduling with multiskilled human resource constraints[D].Shenyang:Northeast University, 2011.
[5]BellenguezMorineau O, Neron E. A branchandbound method for solving multiskill project scheduling problem[J]. Rairo Operation Research, 2007, 41(2):155-170.
[6]Hanne T, Nickel S.A multiobjective evolutionary algorithm for scheduling and inspection planning in software development projects[J]. European Journal of Operational Research,2005,167(3):663-678.
[7]Drezet L E, Billaut J C.A project scheduling problem with labour constraints and time-dependent activities requirements[J]. International Journal of Production Economics,2008,112(1):217-225.
[8]柳春锋.程项目中技能型员工调度问题研究[D].合肥:合肥工业大学, 2011.
Liu Chun-feng. Research on the skilled workforce scheduling problem in the engineering project[D].Hefei:Hefei university of technology, 2011.
[9]Wu M, Sun S. A project scheduling and staff assignment model considering learning effect[J].The International Journal of Advanced Manufacturing Technology,2005,28(11=12):1190-1195.
[10]Yannibelli V,Amandi A.A knowledgebased evolutionary assistant to software development project scheduling[J].Expert Systems with Applications, 2011, 38(7):8403-8413.
[11]Rainer K, Christian H.An efficient metaheuristic for integrated scheduling and staffing IT projects based on a generalized minimum cost flow network[J].Naval Research Logistics, 2012,59 (2):111-127.
[12]王谦,陈芳莲.多系统服务中心的多技能服务人员调度问题研究[J].系统科学与数学,2008,28(11),1337-1345.
Wang Qian,Chen Fang-lian.The workforce planning in a multi-system service center with crosstrained workers[J].Journal of Systems Science and Mathematical Sciences,2008, 28(11):1337-1345.
[13]Bellenguez O, Eron E N. Lower Bounds for the Multi-skill Project Scheduling Problem with Hierarchical Levels of Skills[C]//Burke E K,Trick M.Practice and Theory of Automated Timetabling V.Berlin, Germany: Springer,2005: 229243.
[14]Hesham K A, James E B J. Integrated project task and manpower scheduling[J]. IIE Transactions,1997, 29(9):711-717.
[15]刘雅婷.人力资源受限项目调度问题研究[D].武汉:华中科技大学, 2007.
Liu Ya-ting. The research on human resource-constrained project scheduling problems [D].Wuhan:Huazhong University of Science and Technology,2007.
[16]Li H, Womer K.Scheduling projects with multi-skilled personnel by a hybrid MILP/CP benders decomposition algorithm[J]. Journal of Scheduling,2009,12(3): 281-298.
[17]Burgess A R, Killebrew J B. Variation in activity level on a cyclical arrow diagram [J].Journal of Industrial Engineering, 1962,13(2):76-83.
|