[1]Murthy D N P, Pongpech J. Maintenance of leased equipment[M]. London: Complex System Maintenance Handbook,Springer, 2008: 395-415.
[2]Barlow R, Hunter L. Optimum preventive maintenance policies[J]. Operations Research, 1960, 8(1): 90-100.
[3]Wang H. A survey of maintenance policies of deteriorating systems[J]. European Journal of Operational Research, 2002, 139(3): 469-489.
[4]Pham H, Wang H. Imperfect maintenance[J]. European Journal of Operational R esearch, 1996, 94(3): 425-438.
[5]Nakagawa T. A summary of periodic replacement with minimal repair at failure[J]. Journal of the Operations Research Society of Japan, 1981, 24(3): 213-228.
[6]Nakagawa T, Kowada M. Analysis of a system with minimal repair and its application to replacement policy[J]. European Journal of Operational Research, 1983, 12(2): 176-182.
[7]Jaturonnatee J, Murthy D N P, Boondiskulchok R. Optimal preventive maintenance of leased equipment with corrective minimal repairs[J]. European Journal of Operational Research, 2006, 174(1): 201-215.
[8]Pongpech J, Murthy D N P. Optimal periodic preventive maintenance policy for leased equipment[J]. Reliability Engineering & System Safety, 2006, 91(7): 772-777.
[9]Yeh R H, Kao K C, Chang W L. Optimal preventive maintenance policy for leased equipment using failure rate reduction[J]. Computers & Industrial Engineering, 2009, 57(1): 304-309.
[10]Yeh R H, Chen C K. Periodical preventivemaintenance contract for a leased facility with Weibull lifetime[J]. Quality and Quantity, 2006, 40(2): 303-313.
[11]Yeh R H, Chang W L. Optimal threshold value of failurerate for leased products with preventive maintenance actions[J]. Mathematical and Computer Modelling, 2007, 46(5): 730-737.
[12]Yeh R H, Chang W L, Lo H C. Optimal length of lease period and maintenance policy for leased equipment with a controllimit on age[J]. Mathematical and Computer modelling, 2011, 54(9): 2014-2019.
[13]Cheng C Y, Zhao X F, Chen M, et al. A failureratereduction periodic preventive maintenance model with delayed initial time in a finite time period[J]. Quality Techonlogy& Quantitative Management,2014,11(3):245-254.
[14]金琳, 黄开敏, 周晓军. 租赁设备的多阶段预防性维护策略及优化[J]. 计算机集成制造系统,2013,19(12):2947-2953.
Jin Lin, Huang Kai-min, Zhou Xiao-jun. Multi-period preventive maintenance policy and optimization for leased equipment[J]. Computer Integrated Manufacturing Systems, 2013,19(12):2947-2953.
[15]Chattopadhyay G N, Murthy D N P. Warranty cost analysis for secondhand products[J]. Mathematical and Computer Modelling, 2000, 31(10): 81-88.
[16]Pongpech J, Murthy D N P, Boondiskulchock R. Maintenance strategies for used equipment under lease[J]. Journal of Quality in Maintenance Engineering, 2006, 12(1): 52-67.
[17]Yeh R H, Lo H C, Yu R Y. A study of maintenance policies for secondhand products[J]. Computers & Industrial Engineering, 2011, 60(3): 438-444.
[18]Coria V H, Maximov S, RivasDávalos F, et al. Analytical method for optimization of maintenance policy based on available system failure data[J]. Reliability Engineering & System Safety, 2014.
[19]张守玉, 刘博强. 小样本下装备平均维修时间验前分布确定方法研究[J]. 装备指挥技术学院学报,2010, 21(5): 93-96.
Zhang Shou-yu, Liu Bo-qiang. Study on ascertainment method of prior distribution for MTTR on small samples[J]. Journal of the Academy of Equipment Command & Technology, 2010, 21(5): 93-96.
|