[1]何桢, 生静, 施亮星. 测量系统的R&R分析在企业质量改进中的应用[J]. 工业工程, 2003, 6(1): 62-66.
He Zhen, Sheng Jing, Shi Liang-xing. Application of R&R analysis of measurement system analysis in enterprise quality improvement[J]. Industrial Engineering, 2003, 6(1): 62-66.
[2]Automotive Industry Action Group. Measurement system analysis reference manual[M]. 3rd Edition. Troy, Mich: Automotive Industry Action Group, 2002: 55-73.
[3]Montgomery D C. Statistical quality control: a modern introduction[M]. 6th Edition. New York: John Wiley& Sons Inc, 2009: 370-371.
[4]Burdick R K, Borror C M, Montgomery D C. A review of methods for measurement systems capability analysis[J]. Journal of Quality Technology, 2003, 35(4): 342-354.
[5]Epstein E S. A scoring system for probability forecasts of ranked categories[J]. Journal of Applied Meteorology, 1969,8(6): 985-987.
[6]Candille G, Talagrand O. Evaluation of probabilistic prediction systems for a scalar variable[J]. Quarterly Journal of the Royal Meteorological Society, 2005,131(609): 2131-2150.
[7]Hersbach H. Decomposition of the continuous ranked probability score for ensemble prediction systems[J]. Weather and Forecasting, 2000,15(5): 559-570.
[8]Brcker J. Evaluating raw ensembles with the continuous ranked probability score[J]. Quarterly Journal of the Royal Meteorological Society, 2012,138(667): 1611-1617.
[9]Biondi D, De Luca D L. Performance assessment of a Bayesian Forecasting System (BFS) for realtime flood forecasting[J]. Journal of Hydrology, 2013,479(1): 51-63.
[10]Gneiting T, Raftery A E, Westveld III A H, et al. Calibrated probabilistic forecasting using ensemble model output statistics and minimum CRPS estimation[J]. Monthly Weather Review, 2005, 133(5): 1098-1118.
[11]Grimit E P, Gneiting T, Berrocal V J, et al. The continuous ranked probability score for circular variables and its application to mesoscale forecast ensemble verification[J]. Quarterly Journal of the Royal Meteorological Society, 2006,132(621C): 2925-2942.
[12]Friedman D. Effective scoring rules for probabilistic forecasts[J]. Management Science, 1983, 29(4): 447-454.
[13]Nau R F. Should scoring rules be “effective”?[J]. Management Science, 1985, 31(5): 527-535.
[14]Houf R E, Berman D B. Statistical analysis of power module thermal test equipment performance[J]. Components, Hybrids, and Manufacturing Technology, IEEE Transactions on, 1988, 11(4): 516-520.
|