[1] RUSSELL R A. A comparison of heuristics for scheduling project with cash flows and resource restrictions[J].Management Science, 1986, 32(10):1291-1300 [2] 何正文,刘人境,胡信布, 等.现金流平衡约束下的Max-npv项目调度[J].系统工程理论与实践,2009,29(3):132-140 HE Zhengwen, LIU Renjing, HU Xinbu, et al. Max-npv project scheduling Problems with cash flow balance constraints[J]. Systems Engineering - Theory & Practice,2009,29(3):132-140 [3] DOERSCH R H, PATTERSON J H. Scheduling a project to maximize its present value:a zero-one programming approach[J]. Management Science, 1977, 23(8):882-889 [4] DAYANAND N, PADMAM R. Project contracts and payment schedules:the client's problem[J]. Management Science, 2001,47(12):1654-1667 [5] 李诗娴. 基于净现值的资源受限型项目调度问题研究[D]. 天津:天津大学, 2012 LI Shixian. Research on resource-constrained project scheduling problem based on net present value[D]. Tianjin:Tianjin University, 2012 [6] 何小丽. 考虑时间转换约束的净现值最大项目进度研究[D]. 郑州:郑州大学, 2012 HE Xiaoli. Study on maximizing the net present value of the project progress by considering time conversion constraints.[D]. Zhengzhou:Zhengzhou University, 2012 [7] 何正文,徐渝.工程项目支付进度优化:一个案例研究[J].管理工程学报, 2008,22(1):67-71 HE Zhengwen, Xu Yu. Project payment schedule optimization:a case study[J]. Journal of Management Engineering, 2008,22(1):67-71 [8] 马志强,何正文,黄昶生.现金流均衡项目调度优化[J]. 工业工程与管理, 2014,19(3):109-115 MA Zhiqiang, HE Zhengwen, HUANG Changsheng. Cash flow balanced project scheduling optimization[J]. Industrial Engineering and Mnagement, 2014,19(3):109-115 [9] 何正文,刘人境,胡信布. 基于合同双方交互作用的项目调度优化[J]. 管理科学学报, 2014,17(8):48-58 HE Zhengwen, LIU Renjing, HU Xinbu. Project scheduling optimization based on interaction between two parties of contracts[J]. Journal of Management Sciences in China, 2014,17(8):48-58 [10] 李兰英, 何正文,刘人境.合同双方基于合作博弈的Max-npv项目调度优化[J]. 工业工程与管理, 2016,21(5):42-48 LI Lanying, HE Zhengwen, LIU Renjing. Multimode max-npv project scheduling optimization of both parties of contract based on cooperative game[J]. Industrial Engineering and Management, 2016,21(5):42-48 [11] 郑维博,何正文,刘人境. 基于融资能力约束的多模式Max-npv项目调度优化:双重视角[J]. 运筹与管理,2016,25(1):25-34 ZHENG Weibo, HE Zhengwen, LIU Renjing. Financing capacity constraint based multimode max-npv project scheduling optimization from both perspectives of contract[J]. Operations Research and Management Science. 2016,25(1):25-34 [12] 郑维博,何正文,刘人境. 随机工期下基于可更新资源约束的Max-npv项目鲁棒性调度优化[J]. 管理工程学报, 2017, 31(4):186-192 ZHENG Weibo, HE Zhengwen, LIU Renjing. Renewable resource constraint based max-npv project robust scheduling optimization with stochastic activity duration[J]. Journal of Engineering Management, 2017, 31(4):186-192 [13] 王艳婷, 何正文,刘人境. 随机工期下反应性多模式项目调度优化[J]. 系统管理学报,2017,26(1):86-93 WANG Yanting, HE Zhengwen, LIU Renjing. Reactive strategies in the multi-mode project scheduling with stochastic activity durations[J]. Journal of Systems and Management, 2017,26(1):86-93 [14] ELMAGHRABY S E. Activity nets:a guided tour through some recent developments[J]. European Journal of Operational Research, 1995, 82(3):383-408 [15] 熊燕华,沈厚才,周晶,等.工程项目调度技术研究综述[J]. 数学的实践与认识, 2013,43(21):1-14 XIONG Yanhua, SHEN Houcai, ZHOU Jing, et al. Theoretic review of project scheduling technology[J]. Mathematics in Practice and Theory, 2013,43(21):1-14 |