Industrial Engineering Journal ›› 2018, Vol. 21 ›› Issue (4): 43-50,61.doi: 10.3969/j.issn.1007-7375.2018.04.006

Previous Articles     Next Articles

Integrated Optimization of Project Payment Scheduling Based on the Maximization of Net Present Value: A Case Study

JIN Yan1, HE Zhengwen2   

  1. 1. School of Urban Construction, Xi'an Siyuan University, Xi'an 710038, China;
    2. School of Management, Xi'an Jiaotong University, Xi'an 710049, China
  • Received:2017-11-07 Online:2018-08-30 Published:2018-08-27

Abstract: Taking a real estate outside infrastructure project as background, the payment scheduling problem based on the max-npv is studied. The project is presented at first. And then the optimization model of Max-npv scheduling problem is constructed under the constraint of capital, and the satisfactory payment schedule based on the dynamic equilibrium of cash flow is obtained. Finally, the optimal solution is compared with the actual implementation of the project, the net present value of the project is improved by 17.8%, and the maximum funding gap is improved. The study provides a basis for the quantitative decision making of project payment schedule management.

Key words: project payment scheduling, outdoor supporting project, optimization model

CLC Number: