[1] XU J, XU X, XIE S Q. Recent developments in Dual Resource Constrained (DRC) system research[J]. European Journal of Operational Research, 2011, 215(2):309-318 [2] BOKHORST J A C, SLOMP J, GAALMAN G J C. On the who-rule in Dual Resource Constrained (DRC) manufacturing systems[J]. International Journal of Production Research, 2004, 42(23):5049-5074 [3] NORMAN B A, THARMMAPHORNPHILAS W, NEEDY K L, et al. Worker assignment in cellular manufacturing considering technical and human skills[J]. International Journal of Production Research, 2002, 40(6):1479-1492 [4] HAMEDI M, ESMAEILIAN G R, ISMAIL N, et al. Capability-based virtual cellular manufacturing systems formation in dual-resource constrained settings using Tabu Search[J]. Computers and Industrial Engineering, 2012, 62(4):953-971 [5] LI J, HUANG Y, NIU X. A branch population genetic algorithm for dual-resource constrained job shop scheduling problem[J]. Computers and Industrial Engineering, 2016, 102:113-131 [6] PAPADOPOULOS H T, HEAVEY C. Queueing theory in manufacturing systems analysis and design:A classification of models for production and transfer lines[J]. European Journal of Operational Research, 1996, 92(1):1-27 [7] BALSAMO S, PERSONE V N. A survey of product form queueing networks with blocking and their equivalences[J]. Annals of Operations Research, 1994, 48(1):31-61 [8] VAN VUUREN M, ADAN I J B F, RESING-SASSEN S A E. Performance analysis of multi-server tandem queues with finite buffers and blocking[J]. OR Spectrum, 2005, 27(2-3):315-338 [9] MANITZ M. Queueing-model based analysis of assembly lines with finite buffers and general service times[J]. Computers and Operations Research, 2008, 35(8):2520-2536 [10] CRUZ F R B, SMITH J M. Approximate analysis of M/G/c/c state-dependent queueing networks[J]. Computers and Operations Research, 2007, 34(8):2332-2344 [11] SMITH J M. Robustness of state-dependent queues and material handling systems[J]. International Journal of Production Research, 2010, 48(16):4631-4663 [12] SMITH J M. System capacity and performance modelling of finite buffer queueing networks[J]. International Journal of Production Research, 2014, 52(11):3125-3163 [13] 刘建军, 陈庆新, 毛宁, 等. 带分段环形路径AGV的制造系统排队网建模与分析[J]. 工业工程, 2017, 20(1):83-90 LIU Jianjun, CHEN Qingxin, MAO Ning, et al. Queuing network modeling and analysis of manufacturing system with AGV with multi-section-annular path[J]. Industrial Engineering Journal, 2017, 20(1):83-90 [14] 陈冠中, 陈庆新, 毛宁, 等. 智能制造系统AGV小车及缓冲区容量仿真优化[J]. 工业工程, 2016, 19(3):77-84 CHEN Guanzhong, CHEN Qingxin, MAO Ning, et al. Simulation optimization of AGV and buffer capacity in intelligent manufacturing system[J]. Industrial Engineering Journal, 2016, 19(3):77-84 [15] 谢洁明, 毛宁, 陈庆新. 随机性因素对机器人单元性能的影响分析[J]. 工业工程, 2017, 20(6):84-89+95 XIE Jieming, MAO Ning, CHEN Qingxin. Modeling robotic cell and analyzing the influences of stochastic factors[J]. Industrial Engineering Journal, 2017, 20(6):84-89+95 [16] HASKOSE A, KINGSMAN B G, WORTHINGTON D. Modelling flow and jobbing shops as a queueing network for workload control[J]. International Journal of Production Economics, 2002, 78(3):271-285 [17] HASKOSE A, KINGSMAN B G, WORTHINGTON D. Performance analysis of make-to-order manufacturing systems under different workload control regimes[J]. International Journal of Production Economics, 2004, 90(2):169-186 [18] KERBACHE L, SMITH J M. Asymptotic behavior of the expansion method for open finite queueing networks[J]. Computers and Operations Research, 2010, 15(2):157-169 [19] SMITH J M. M/G/c/K blocking probability models and system performance[J]. Performance Evaluation, 2003, 52(4):237-267 [20] STEWART W J. Probability, Markov chains, queues, and simulation. The mathematical basis of performance modeling[M]. United States of America:British Library Cataloging, 2009. |