LIAO Yi, YE Yan, LENG Jiewu. Study of Large-Vehicle-Based Unmanned Delivery Vehicle Routing Problem with Replenishment[J]. Industrial Engineering Journal, 2023, 26(1): 108-114.
[1] 陆淼嘉, 尹钦仪. “最后一公里”无人车配送发展现状及应用前景[J]. 综合运输, 2021, 43(1): 117-121 LU Miaojia, YIN Qinyi. The development and applications of Last-Mile autonomous delivery vehicle[J]. China Transportation Review, 2021, 43(1): 117-121 [2] 崔少飞. 底层为电动车的双层车辆路径规划[D]. 北京: 北京交通大学, 2018. CUI Shaofei. The wo-echelon capacitated vehicle routing problem with using electric vehicle in the Second-level routs[D]. Beijing: Beijing Jiaotong University, 2018. [3] JENNINGS D, FIGLIOZZI M. Study of sidewalk autonomous delivery robots and their potential impacts on freight efficiency and travel[J]. Transportation Research Record, 2019, 2673(6): 317-326 [4] LIU D, DENG Z H, MAO X H, et al. Two-echelon vehicle-routing problem: optimization of autonomous delivery vehicle-assisted e-grocery distribution[J]. IEEE Access, 2020, 8: 108705-108719 [5] BOYSEN N, SCHWERDFEGER S, WEIDINGER F. Scheduling last-mile deliveries with truck-based autonomous robots[J]. European Journal of Operational Research, 2018, 271(3): 1085-1099 [6] SIMONI M D, KUTANOGLU E, CLAUDEL C G. Optimization and analysis of a robot-assisted last mile delivery system[J]. Transportation Research Part E: Logistics and Transportation Review, 2020, 142: 102049 [7] YU S, PUCHINGER J, SUN S. Two-echelon urban deliveries using autonomous vehicles[J]. Transportation Research Part E: Logistics and Transportation Review, 2020, 141: 102018 [8] SHAW P. Using constrait programming and local search methods to solve vehicle routing problems[C]. Principles and Practice of Constraint Programming-CP78. Heidelberg: Springer, 1998: 417-431. [9] 江孙军. 考虑中心仓的多仓库多车型车辆路径问题[D]. 广州: 广东工业大学, 2020. JIANG Sunjun. Multi-warehouse heterogeneous fleet vehicle routing problem with considering central warehouse[D]. Guangzhou: Guangdong University of Technology, 2020. [10] SOLOMON M M. On the worst-case performance of some heuristics for the vehicle routing and scheduling problem with time window constraints[J]. Networks, 1986(16): 161-174