[1] 车阿大, 王远.无等待多机器人制造单元调度模型和算法研究[J]. 计算机集成制造系统, 2008, 14(3): 525-534. CHE Ada, WANG Yuan. Scheduling model and its algorithm for no-wait robotic cell with multiple robots[J]. Computer Integr ated Manufacturing Systems, 2008, 14(3): 525-534. [2] 张沙清, 杨海东, 赵洁. 柔性JobShop类型机器人制造单元调度研究[J]. 计算机技术与发展, 2015, 25(5): 68-73. ZHANG Shaqing, YANG Haidong, ZHAO Jie. Research on flexible job shop scheduling problem of robotic manufacturing cell[J]. Computer Technology and Development, 2015, 25(5): 68-73. [3] DROBOUCHEVITCH I G, GEISMAR H N, SRISKANDARAJAH C. Throughput optimization in robotic cells with input and output machine buffers: a comparative study of two key models[J]. European Journal of Operational Research, 2010, 206(3):623-633. [4] BRAUNER N, FINKE G, LEHOUX L V, et al. Scheduling of coupled tasks and one-machine no-wait robotic cells[J]. Computers & Operations Research, 2009, 36(2): 301-307. [5] SRISKANDARAJAH C, DROBOUCHEVITCH I G, SETHI S, et al. Scheduling multiple parts in a robotic cell served by a dual gripper robot[J]. Operations Research, 2003, 52(1): 65-82. [6] KIM J H, LEE T E. Schedulability analysis of time-constrained cluster tools with bounded time variation by an extended Petri net[J]. IEEE Trans on Automation Science and Engineering, 2008, 5(3): 490-503. [7] GEISMAR H N, SRISKANDARAJAH C, RAMANAN N. Increasing throughput for robotic cells with parallel machines and multiple robots[J]. IEEE Transactions on Automation Science and Engineering, 2004, 1(1): 84-89. [8] ZHOU Zhen, CHE Ada, YAN Pengyu. A mixed integer programming approach for multicyclic robotic flowshop scheduling with time window constraints[J]. Applied Mathematical Modeling, 2011, 36(8): 3612-3629. [9] JACQUES C, MOHAMED H, MOHAMED K. An optimization-based heuristic for the robotic cell problem[J]. European Journal of Operational Research, 2010, 202(3): 636-645. [10] BATUR D G, KARASAN O E, AKTURK M S. Multiple part-type scheduling in flexible robotic cells[J]. International Journal of Production Economics, 2012, 135(2): 726-740. [11] CRAMA Y, KATS V, KLUNDERT J V, et al. Cyclic scheduling in robotic flowshops[J]. Annals of Operations Research, 2000(96): 97-124. |