Lei Weidong, Che Ada. Scheduling Algorithm for Automated Mixed Production Line with Time Window Constraint[J]. Industrial Engineering Journal , 2011, 14(5): 110-115.
[1]Dawande M,Geismar H N,Sethi S P,et al. Sequencing and scheduling in robotic cells: recent development [J]. Journal of Scheduling,2005,8(5):387-426.
[2]Che A,Chu C. Multidegree cyclic scheduling of a no wait robotic cell with multiple robots [J]. European Journal of Operation Research,2009,199(1): 77-88.
[3]Leung J,Zhang G. Optimal cyclic scheduling for printed circuitboard production lines with multiple hoists and general processing sequences[J]. IEEE Transactions on Robotics and Automation 2003,19(3): 480-484.
[4]Lei L,Wang T J. A proof: the cyclic hoist scheduling problem is NP-hard [R]. New Jersey,USA: Rutgers University,1989.
[5]Chen H,Chu C,Proth J M. Cyclic scheduling of a hoist with time window constraints [J]. IEEE Transactions on Robotics and Automation,1998,14(1): 144-152.[6]Yan P,Chu C,Yang N,et al. A branch and bound algorithm for Optimal Cyclic Scheduling in a Robotic Cell with Processing Time windows [J]. International Journal of Production Research,2010,48(21): 6461-6480.
[7]李鹏,车阿大. 基于混沌遗传算法的自动化生产单元调度方法研究[J].系统工程,2008,26(11):75-80.
[8]Liu J,Jiang Y,Zhou Z. Cyclic scheduling of a single hoist in extended electroplating lines: a comprehensive integer programming solution [J]. IIE Transactions,2002,34(10): 905-914.
[9]Che A,Chu C. Cyclic hoist scheduling in large reallife electroplating lines [J]. OR Spectrum,2007,29(3): 445-470.
[10]Lei L,Liu Q. Optimal cyclic scheduling of a robotic processing line with twoproduct and timewindow constraints [J]. INFOR,2001,39(2): 185-199.
[11]Amraoui A E,Manier A M,Moudni A E,et al. A mixed linear problem for a multipart cyclic hoist scheduling problem [J]. International Journal Science and Techniques of Automatic & Computer Engineering,2008,2(special issue): 612-623.