1]谢家平,赵忠,孔令丞,等.再制造生产计划的影响因素及其模式[J].系统工程,2005,25(7):53-59.
Xie Jiaping, Zhao Zhong, Kong Lingcheng,et al.An affecting factors and optimizing model for the remanufacturing production planning[J].Systems Engineering,2005,25(7):53-59 .
[2]王波,王宁生.基于Petri网产品拆卸模型的研究[J].华东船舶工业学院学报,2003,17(3):87-90.Wang Bo, Wang Ningsheng.Research on disassembly model based on petri net for a product[J]. Journal of East China Shipbuilding Institute,2003,17(3):87-90.
[3]赵树恩,李玉玲.模糊推理Petri网及其在产品拆卸序列决策中的应用[J].控制与决策,2005,20(10):1181-1184.
〖DW〗Zhao Shuen, Li Yuling.Fuzzy reasoning petri nets and its application to disassembly sequence decision of products[J].Control and Decision,2005,20(10):1181-118.
[4]Lambert A J D.Disassembly sequencing:a survey[J].International Journal of Production Research,2003,41(16):3721-3759.
[5]Kendra E Moore,Askiner Gungor.A petri net approach to disassembly process planning[J].Computers & Industrial Engineering,1998,35(1):165-168.
[6]Tang Ying. Unified Colored Timed Petri Net Models for the Adaptive Control of Disassembly Systems[DB/OL].(2008-08-23).http://ieeexplore.ieee.org/xpl/freeabs_all.jsp?arnumber=4626438.Proceedings of 4th IEEE Conference on Automation Science and Engineering.
[7]Seo K K,Park J H,Jang S S.Optimal disassembly sequencing using genetic
algorithms considering economic and environmental aspects[J].The International Journal of
Advanced Manufacturing Technology,2001,18(5):371380.
[8]Belarmino ASensoSiaz,Santiago GarciaCarbajal.An efficient GRASP algorithm for
Disassembly sequence planning[J].OR spectrum,2007,29(3):535549.
[9]Zuidwijk R,Harold Krikke.Disassembly for recovery under uncertainty[C].Proceedings
of SPIE,Boston,2002(44):4453.〖ZK)〗
[10]〖ZK(#〗Elif Kongar,Surendra M Gupta.Disassembly to order system under uncertainty[J
].The International Journal of Management Science,2006,34(6):550561.
[11]Spyros A.Reveliotis.Modelling and Controlling uncertainty in optimal Disassembly
planning through reinforcement learning[DB/OL].(20050818).
http://ieeexplore.ieee.org/xpls/abs_all.jsp?arnumber=1527567.Proceedings of 2004 IEEE
International Conference on Robotics and Automation,New Orleans.
[12]Moore K E,Gungor A,Gupta S M.Petri net approach to disassembly process planning for
products with complex AND/OR precedence relationships[J].European Journal of Operations
Research, 2001,135(2):428449.
[13]Pnueli Y,Zussman E.Evaluating the endoflife value of a product and improve it by
redesign[J].International Journal of Production Research,1996,35(4):921942.
[14]Kevin M Passino,Stephen Yurkovich.Fuzzy Control[M].北京:清华大学出版社,2001:301
303.
[15]〖WB〗章小红,李世其,王俊峰.基于蚁群算法的产品拆卸序列规划方法[J].计算机辅助设计与图
形学习,2007,19(3):387397.
〖DW〗Zhang Xiaohong, Li Shiqi, Wang Junfeng.Product disassembly sequence planning
based on ant colony optimization[J].Journal of Computeraided Design & Computer
Graphisc,2007,19(3):387397. |