[1]Be?瘙塂ikci U, Bilge , Ulusoy G. Resource dedication problem in a multiproject environment[J]. Flexible Services and Manufacturing Journal, 2013, 25(1-2): 206-229.
[2]Cani ls M C, Bakens R J. The effects of project management information systems on decision making in a multi project environment[J]. International Journal of Project Management, 2012, 30(2): 162-175.
[3]方炜,欧立雄. 多项目环境下新产品研发项目资源分配问题研究[J]. 管理工程学报,2005,19(S1):6-10.
Fang Wei, Ou Li-xiong. A study of new product development resource allocation problem in multiproject environment[J]. Journal of Industrial Engineering and Engineering Management,2005,19(S1): 6-10.
[4]方晨,王凌. 资源约束项目调度研究综述[J]. 控制与决策,2010,25(5):641-650.
Fang Chen, Wang Ling. Review of resourceconstrained project schedule problem[J]. Control and Decision,2010,25(7):641-650.
[5]寿涌毅.资源约束下多项目调度的迭代算法[J].浙江大学学报:工学版, 2004,38(8):1095-1099.
Shou Yong-yi. Iterative algorithm of resourceconstrained multiproject schedule problem[J]. Journal of Zhejiang University: Engineering Science, 2004,38(8):1095-1099.
[6]Browning T R, Yassine A A. Resourceconstrained multiproject scheduling: Priority rule performance revisited[J].International Journal of Production Economics,2010,126(2): 212-228.
[7]Kanit R, Ozkan O, Gunduz M. Effects of project size and resource constraints on project duration through priority rulebase heuristics[J]. Artificial Intelligence Review, 2009, 32(1-4):115-123.
[8]Masmoudi M, Hans E, Leus R, et al. Stochastic and fuzzy workload plans in project tactical planning under uncertainty[J]. Information Control Problems in Manufacturing, 2012,14(1):616-623.
[9]KhaliliDamghani K, SadiNezhad S. A decision support system for fuzzy multiobjective multiperiod sustainable project selection[J]. Computers & Industrial Engineering, 2013, 64(4):1045-1060.
[10]Hapke M, Jaszkiewicz A, Slowinski R.Fuzzy project scheduling system for software development[J]. Fuzzy Sets and Systems, 1994, 67(1): 101-117.
[11]Hapke M, Slowinski R. Fuzzy priority heuristics for project scheduling[J]. Fuzzy Sets and Systems, 1996, 83(3): 291-299.
[12]Wang J. A fuzzy robust scheduling approach for product development projects[J]. European Journal of Operational Research, 2004, 152(1): 180-194.
[13]Kim S Y, Leachman R C. Multiproject scheduling with explicit lateness costs[J]. IIE Transactions,1993,25 (2): 34-44.
[14]Lova A, Tormos P. Analysis of scheduling schemes and heuristic rules performance in resourceconstrained multiproject scheduling[J]. Annals of Operations Research,2001,102(1-4): 263-286.
[15]Homberger J.A (μ,SymbollAp)coordination mechanism for agentbased multiproject scheduling[J]. OR Spectrum, 2012, 34(1): 107-132.
[16]Kolish R. Serial and parallel resourceconstrained project scheduling methods revisited: Theory and computation[J].European Journal of Operational Research, 1996,90(2): 320333.
[17]Bhaskar T, Manabendra N, Asim K. A heuristic method for RCPSP with fuzzy activity times[J].European Journal of Operational Research, 2011,208(1): 57-66. |