[1]Stalk G, Hout T M.Competing against time: how time-based competition is reshaping global markets[M].NY: The Free Press,1990.
[2]Blackburn J D, Elrod T,Lindsley W B,et al.The strategic value of response time and product variety[M].London:Chapman and Hall,1992.
[3]Weng Z K. Manufacturing lead times, system utilisation rates and lead time related demands[J].European Journal of Operational Research,1996,89(2):259-268.
[4]So K C, Song J S. Price, delivery time guarantees and capacity selection[J]. European Journal of Operational Research, 1998,111(1): 28-49.
[5]Liu L, Parlar M, Zhu S X. Pricing and lead time decisions in decentralized supply chains[J]. Management Science, 2007,53(5): 713-725.
[6]Ray S, Jewkes E.Customer lead time management when both demand and price are lead time sensitive[J].European Journal of Operational Research,2004,153(3):769-781.
[7]Jayaswal S, Jewkes E, Ray S. Product differentiation and operations strategy in a capacitated environment[J]. European Journal of Operational Research,2011,210(3):716-728.
[8]Ray S, Li S, Song Y. Tailored supply chain decisionmaking under price-sensitive stochastic demand and delivery uncertainty[J]. Management Science,2005,51(12):18731891.
[9]李怡娜, 徐学军. 信息不对称条件下可控提前期供应链协调机制研究[J]. 管理工程学报, 2011, 25(3): 194-199.
Li Yi-na,Xu Xue-jun. Supply chain coordination with controllable lead time and asymmetric information[J]. Journal of Industrial Engineering/Engineering Management, 2011, 25(3): 194-199.
[10]林勇,乐晓娟,于建红.面向短生命周期产品的供应链订购批量与交货期协调决策模型[J].中国管理科学,2007,15(4):63-69.
Lin Yong,Le Xiao-juan,Yu Jian-hong.A study on delivery time and quantity coordination decision model for short life cycle product supply chain[J]. Chinese Journal of Management Science,2007,15(4):63-69.
[11]邵建军,柯大钢.价格、时间敏感需求下的供应链价格与交付期管理[J].管理工程学报,2008,22(4):92-94.
Shao Jian-jun,Ke Da-gang.Supply chain price and delivery time management under time and price sensitive demand[J].Journal of Industrial Engineering Engineering Management,2008,22(4):92-94.
[12]Karkmarkar U S. Lot sizes, lead times and inprocess inventories[J]. Management Science, 1987,33(3): 409-418.
[13]Chandra P, Gupta S. Managing batch processors to reduce lead time in a semiconductor packaging line[J]. International Journal of Production Research, 1997,35(3): 611-633.
[14]Glock C H.Lead time reduction strategies in a single vendor single buyer integrated inventory model with lot sizedependent lead times and stochastic demand[J].Int J Production Economics ,2012,136(1):37-44.
[15]Kim J S,Benton W C.Lot size dependent lead times in a Q,R inventory system[J].International Journal of Production Research,1995,33(1):41-58. |