[1]李志坚.建筑工程进度影响因素及其控制措施[J].建筑设计管理,2010.27(2):68-69.
[2]Goldratt E M. Critical Chain[M]. New York: The North River Press, 1997.
[3]Watson K J, Blackstone J H, Gardiner S C. The evolution of a management philosophy: The theory of constraints[J].Journal of Operations Management, 2007,25(2): 387-402.
[4]Yeo K T, Ning J H. Managing uncertainty in major equipment procurement in engineering projects[J]. European Journal of Operational Research, 2006, 171(1):123-134.
[5]马国丰,屠梅曾.制约因素在项目进度管理的应用[J].管理工程学报,2002,16(4): 72-75.
Ma Guo-feng,Tu Mei-zeng. The application of TOC in the project schedule management[J].Journal of Industrial Engineering / Engineering Management,2002,16(4):72-75.
[6]马国丰,尤建新,杜学美.识别关键冲突任务的定量分析[J].上海交通大学学报,2006, 40(4): 670-676.
Ma Guo-feng,You Jian-xin,Du Xue-mei.Quantitative analysis of identifying critical conflict tasks[J].Journal of Shanghai Jiaotong University,2006,40(4):670-676.
[7]徐小琴,韩文民.关键链汇入缓冲区的设置方法[J].工业工程与管理,2007,12(5): 51-55.
Xu Xiaoqin, Han Wenmin. The setting study for feeding buffer of critical chain scheduling[J].Industrial Engineering and Management,2007,12(5): 51-55.
[8]张敏.项目进度管理的行为不确定性及其控制策略研究[D].武汉:华中科技大学,2011,4:58-69.
ZhangMin. Research on the behavior uncertainty in project progress management and it's control policies[D].Wuhan:Huazhong University of Science & Technology,2011,4:58-69.
[9]王诺.网络计划技术中各工序间相关性的若干研究[J]. 系统工程学报,1997,12(2):36-39.
Wang Nuo. Study of the relation among the activities in network planning technique[J]. Journal of Systems Engineering, 1997,12(2):36-39. |