[1] VILLAFÁÑEZ F, POZA D, LÓPEZ-PAREDES A, et al. A generic heuristic for multi-project scheduling problems with global and local resource constraints (RCMPSP)[J]. Soft Computing, 2019, 23(10): 3465-3479 [2] FRICKE S E, SHENBAR A J. Managing multiple engineering projects in a manufacturing support environment[J]. IEEE Transactions on Engineering Management, 2000, 47(2): 258-68 [3] LOVA A, TORMOS P. Analysis of scheduling schemes and heuristic rules performance in resource-constrained multiproject scheduling[J]. Annals of Operations Research, 2001, 102(1/4): 263-286 [4] ENGWALL M, JERBRANT A. The resource allocation syndrome: the prime challenge of multi-project management?[J]. International Journal of Project Management, 2003, 21(6): 403-409 [5] 方晨, 王凌. 资源约束项目调度研究综述[J]. 控制与决策, 2010, 25(5): 641-650 FANG Chen, WANG Ling. Survey on resource-constrained project scheduling[J]. Control and Decision, 2010, 25(5): 641-650 [6] HARTMANN S, BRISKORN D. A survey of variants and extensions of the resource-constrained project scheduling problem[J]. European Journal of Operational Research, 2010, 207(1): 1-14 [7] HOMBERGER J. A (μ, λ)-coordination mechanism for agent-based multi-project scheduling[J]. OR Spectrum, 2012, 34(1): 107-132 [8] FINK A, HOMBERGER J. An ant-based coordination mechanism for resource-constrained project scheduling with multiple agents and cash flow objectives[J]. Flexible Services and Manufacturing Journal, 2013, 25(1): 94-121 [9] ADHAU S, MITTAL M L, MITTAL A. A multi-agent system for decentralized multi-project scheduling with resource transfers[J]. International Journal of Production Economics, 2013, 146(2): 646-661 [10] KOLISCH R. Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation[J]. European Journal of Operational Research, 1996, 90(2): 320-333 [11] KURTULUS I, DAVIS E W. Multi-project scheduling: categorization of heuristic rules performance[J]. Management Science, 1982, 28(2): 161-172 [12] BROWNING T R, YASSINE A A. Resource-constrained multi-project scheduling: Priority rule performance revisited[J]. International Journal of Production Economics, 2010, 126(2): 212-228 [13] WANG Y, HE Z, KERKHOVE L-P, et al. On the performance of priority rules for the stochastic resource constrained multi-project scheduling problem[J]. Computers & Industrial Engineering, 2017, 114(Supplement C): 223-234 [14] 来凯, 王小明, 陈庆新, 等. 面向模具项目动态调度问题的优先规则对比研究[J]. 工业工程, 2017, 20(5): 28-37 LAI Kai, WANG Xiaoming, CHEN Qingxin, et al. A comparative study of priority rules on mold project dynamic scheduling problem[J]. Industrial Engineering Journal, 2017, 20(5): 28-37 [15] WANG X, CHEN Q, MAO N, et al. Proactive approach for stochastic RCMPSP based on multi-priority rule combinations[J]. International Journal of Production Research, 2015, 53(4): 1098-1110 [16] VEPSALAINEN A P J, MORTON T E. Priority rules for job shops with weighted tardiness costs[J]. Management Science, 1987, 33(8): 1035-1047 [17] LAWRENCE S R, MORTON T E. Resource-constrained multi-project scheduling with tardy costs: Comparing myopic, bottleneck, and resource pricing heuristics[J]. European Journal of Operational Research, 1993, 64(2): 168-187 [18] CARROLL D C. Heuristic sequencing of jobs with single and multiple components[D]. Massachusetts: Massachusetts Institute of Technology, 1965. [19] BAKER K R, KANET J J. Job shop scheduling with modified due dates[J]. Journal of Operations Management, 1983, 4(1): 11-22 [20] KANET J, LI X. A weighted modified due date rule for sequencing to minimize weighted tardiness[J]. Journal of Scheduling, 2004, 7(4): 261-276 [21] KOLISCH R, SPRECHER A. PSPLI-A project scheduling problem library[J]. European Journal of Operational Research, 1997, 96(1): 205-216
|