[1] 刘建军, 陈庆新, 毛宁, 等. 随机环境下模具企业车间负荷控制方法[J]. 计算机集成制造系统, 2010, 16(2):263-270 LIU Jianjun, CHEN Qingxin, MAO Ning, et al. Workload control approach for mould enterprises in stochastic production[J]. Computer Integrated Manufacturing System, 2010, 16(2):263-270 [2] GRUNDSTEIN S, SCHUKRAFT S, SCHOLZ-REITER B, et al. Coupling order release methods with autonomous control methods-an assessment of potentials by literature review and discrete event simulation[J]. International Journal of Production Management & Engineering, 2015, 3(1):43-56 [3] 来凯, 王小明, 陈庆新, 等. 面向模具项目动态调度问题的优先规则对比研究[J]. 工业工程, 2017, 20(5):31-40 LAI Kai, WANG Xiaoming, CHEN Qingxin, et al. A comparative study of priority rules for mold project dynamic scheduling[J]. Industrial Engineering Journal, 2017, 20(5):31-40 [4] REEJA M, RAJENDRAN C. Dispatching rules for scheduling in assembly jobshops[J]. International Journal of Production Research, 2000, 38(9):2051-2066 [5] NATARA K, MOHAN K M, BABU B, et al. Performance evaluation of priority dispatching rules in multi-level assembly job shops with jobs having weights for flow time and tardiness[J]. The International Journal of Advanced Manufacturing Technology, 2007, 31(7-8):751-761 [6] STEVENSON M, HENDRY L C. Aggregate load-oriented workload control:A review and a re-classification of a key approach[J]. International Journal of Production Economics, 2006, 104(2):676-693 [7] 张春生, 李铁克. 基于WLC的钢铁企业多工序、多路径订单投放方法[J]. 控制与决策, 2013(5):695-700 ZHANG Chunsheng, LI Tieke. Order release in steel enterprise with multi-production stage and multi-production route based on WLC[J]. Control and Decision, 2013(5):695-700 [8] PERONA M, SACCANI N, BONETTI S, et al. Manufacturing lead time shortening and stabilisation by means of workload control:An action research and a new method[J]. Production Planning and Control, 2016, 27(7):660-670 [9] FERNANDES N O, THÜRER M, SILVA C, et al. Improving workload control order release:Incorporating a starvation avoidance trigger into continuous release[J]. International Journal of Production Economics, 2016:S0925527316304091 [10] THÜRER M, STEVENSON M, SILVA C, et al. Workload control and order release:a lean solution for make-to-order companies[J]. Production and Operations Management, 2012, 21(5):1-15 [11] LAND M, STEVENSON M, THÜRER M. Integrating load-based order release and priority dispatching[J]. International Journal of Production Research, 2014, 52(4):15 [12] MISSBAUER H. Order release and sequence-dependent setup times[J]. International Journal of Production Economics, 1997, 49(2):131-143 [13] THÜRER M, SILVA C, STEVENSON M, et al. Controlled order release:a performance assessment in job shops with sequence-dependent set-up times[J]. Production Planning & Control, 2014, 25(7):603-615 [14] THÜRER M, STEVENSON M, SILVA C, et al. Workload control and order release in two-level multi-stage job shops:an assessment by simulation[J]. International Journal of Production Research, 2013, 51(3):869-882 [15] OOSTERMAN B, LAND M, GAALMAN G. The influence of shop characteristics on workload control[J]. International Journal of Production Economics, 2000, 68(1):107-119 [16] KIM S C, BOBROWSKI P M. Evaluating order release mechanisms in a job shop with sequence-dependent setup times[J]. Production and Operations Management, 1995, 4(2):163-180 [17] PHILIPOOM P, RUSSELL R, FRY T. A preliminary investigation of multi-attribute based sequencing rules for assembly shops[J]. International Journal of Production Research, 1991, 29(4):739-753 [18] THÜRER M, SILVA C, STEVENSON M, et al. Improving the applicability of workload control (WLC):the influence of sequence-dependent set-up times on workload controlled job shops[J]. International Journal of Production Research, 2012, 50(22):12 [19] PEREIRA T, SANTORO C. An integrative heuristic method for detailed operations scheduling in assembly job shop systems[J]. International Journal of Production Research, 2011, 49(20):6089-6105
|