[1] 王小平, 齐欢, 肖恒辉, 等. 基于串联排队网络的三峡-葛洲坝水利枢纽联合调度模型[J]. 交通运输工程学报, 2006, 6(3): 82-86 WANG Xiaoping, QI Huan, XIAO Henghui, et al. Co-scheduling model of Three Gorges-Gezhou Dam based on series queuing network[J]. Journal of Traffic and Transportation Engineering, 2006, 6(3): 82-86 [2] 齐欢, 肖恒辉, 张晓盼, 等. 三峡-葛洲坝两坝联合调度数学模型及算法[J]. 系统工程理论与实践, 2007, 27(2): 99-104 QI Huan, XIAO Henghui, ZHANG Xiaopan, et al. The mathematic model and algorithm for the co-scheduling of the Three Gorges Dam and the Gezhouba Dam[J]. Systems Engineering—Theory & Practice, 2007, 27(2): 99-104 [3] 张晓盼, 齐欢, 袁晓辉. 三峡葛洲坝联合通航调度的混合整数规划[J]. 武汉理工大学学报 (交通科学与工程版) , 2007, 31(1): 1-4 ZHANG Xiaopan, QI Huan, YUAN Xiaohui. Mixed-integer programming to navigation co-scheduling of the three gorges dam and the Gezhouba Dam[J]. Journal of Wuhan University of Technology (Transportation Science & Engineering) , 2007, 31(1): 1-4 [4] 张晓盼, 齐欢, 袁晓辉. 三峡工程两坝联合通航调度的混合模拟退火算法[J]. 控制理论与应用, 2008, 25(4): 708-710 ZHANG Xiaopan, QI Huan, YUAN Xiaohui. Hybrid simulated algorithm on navigation co-scheduling to the two dams of Three Gorges Project[J]. Control Theory & Applications, 2008, 25(4): 708-710 [5] ZHAO X, LIN Q, YU H. A co-scheduling problem of ship lift and ship lock at the Three Gorges Dam[J]. IEEE Access, 2020, 8: 132893-132910 [6] YUAN Y, JI B, YUAN X, et al. Lockage scheduling of Three Gorges-Gezhouba dams by hybrid of chaotic particle swarm optimization and heuristic-adjusted strategies[J]. Applied Mathematics & Computation, 2015, 270(1): 74-89 [7] JI B, YUAN X, YUAN Y. Orthogonal design-based NSGA-III for the optimal lockage co-scheduling problem[J]. IEEE Transactions on Intelligent Transportation Systems, 2017, 18(8): 2085-2095 [8] JI B, ZHANG D, YU S S, et al. An exact approach to the generalized serial-lock scheduling problem from a flexible job-shop scheduling perspective[J]. Computers & Operations Research, 2021, 127: 105164 [9] 邓伟, 邝祝芳, 余绍军, 等. 基于遗传算法的三峡-葛洲坝船闸闸室编排算法[J]. 人民长江, 2016, 47(24): 55-59 DENG Wei, KUANG Zhufang, YU Shaojun, et al. Study on lock chamber scheduling algorithm of Three Gorges and Gezhouba ship locks based on genetic algorithm[J]. Yangtze River, 2016, 47(24): 55-59 [10] 曾非凡. 三峡升船机与船闸联合调度闸室编排算法研究[D]. 长沙: 中南林业科技大学, 2016. [11] 吴小涛, 袁晓辉, Muhammad Adnan Ikram. 基于拟人策略的三峡永久闸室编排新算法[J]. 水电能源科学, 2015, 33(5): 148-151 WU Xiaotao, YUAN Xiaohui, Muhammad Adnan Ikram. A new allocation algorithm of permanent chamber of Three Gorges Dam based on personification strategy[J]. Water Resources and Power, 2015, 33(5): 148-151 [12] ZHAO X, LIN Q, YU H. An improved mathematical model for green lock scheduling problem of the Three Gorges Dam[J]. Sustainability, 2019, 11(9): 1-23 [13] WEI W, OUYANG H, LI S, et al. A modified fireworks algorithm with dynamic search interval based on closed-loop control[J]. Mathematics and Computers in Simulation, 2022, 200(C): 329-360 [14] 张晓盼. 三峡工程两坝联合通航调度算法研究[D]. 武汉: 华中科技大学, 2007. [15] ALSATTAR H A, ZAIDAN A A, ZAIDAN B B. Novel meta-heuristic bald eagle search optimisation algorithm[J]. Artificial Intelligence Review, 2020, 53(6): 2237-2264
|