[1] EID M S, ELBELTAGI E E, EL-ADAWAY I H. Simultaneo-us multi-criteria optimization for scheduling linear infrastructure projects[J]. International Journal of Construction Management, 2021, 21(1): 41-55 [2] ZOU X, FANG S C, HUANG Y S, et al. Mixed-integer linear programming approach for scheduling repetitive projects with time-cost trade-off consideration[J]. Journal of Computing in Civil Engineering, 2017, 31(3): 06016003 [3] ALTUWAIM A, EL-RAYES K. Multiobjective optimization model for planning repetitive construction projects[J]. Journal of Construction Engineering and Management, 2021, 147(7): 04021072 [4] ZOU X, ZHANG L. A constraint programming approach for scheduling repetitive projects with atypical activities considering soft logic[J]. Automation in Construction, 2020, 109: 102990 [5] HEGAZY T, KAMARAH E. Schedule optimization for scat-tered repetitive projects[J]. Automation in Construction, 2022, 133: 104042 [6] ZOU X, ZHANG L H, ZHANG Q. Time-cost optimization in repetitive project scheduling with limited resources[J]. Engineering, Construction and Architectural Management, 2022, 29(2): 669-701 [7] GARCÍA-NIEVES J D, PONZ-TIENDA J L, OSPINA-ALVARADO A, et al. Multipurpose linear programming optimization model for repetitive activities scheduling in construction projects[J]. Automation in Construction, 2019, 105: 102799 [8] TOMCZAK M, JAŚKOWSKI P. New approach to improve general contractor crew's work continuity in repetitive construction projects[J]. Journal of Construction Engineering and Management, 2020, 146(5): 04020043 [9] 马咏, 何正文, 郑维博. 基于柔性资源约束的前摄性项目调度优化研究[J]. 中国管理科学, 2020, 28(7): 220-230 MA Yong, HE Zhengwen, ZHENG Weibo. Research on proactive project scheduling optimization based on flexible resource constraints[J]. Chinese Journal of Management Science, 2020, 28(7): 220-230 [10] 胡雪君, 王建江, 崔南方, 等. 资源转移视角下的RCPSP鲁棒资源分配方法[J]. 系统工程学报, 2020, 35(2): 173-187 HU Xuejun, WANG Jianjiang, CUI Nanfang, et al. RCPSP robust resource allocation method from the perspective of resource transfer[J]. Journal of Systems Engineering, 2020, 35(2): 173-187 [11] 李耀业, 王鹏, 张银博, 等. 物联网技术在项目管理领域研究综述[J]. 建筑经济, 2023, 44(3): 72-78. LI Yaoye, WANG Peng, ZHANG Yinbo, et al. Research review of IOT technology in the field of project management [J]. Construction Economy, 2023, 44 (3): 72-78. [12] MARAVAS A, PANTOUVAKIS J P. Fuzzy repetitive scheduling method for projects with repeating activities[J]. Journal of Construction Engineering and Management, 2011, 137(7): 561-564 [13] 张国. 大商务管理体系在基建投资项目中的运用[J]. 建筑经济, 2024, 45(4): 52-56. ZHANG Guo. Application of big business management system in infrastructure investment projects [J]. Construction Economy, 2024, 45 (4): 52-56. [14] KATSURAGAWA C M, LUCKO G, ISAAC S, etal. Fuzzy linear and repetitive scheduling for construction projects[J]. Journal of Construction Engineering and Management, 2021, 147(3): 04021002 [15] BAKRY I, MOSELHI O, ZAYED T. Optimized schedulin-g and buffering of repetitive construction projects under uncertainty[J]. Engineering, Construction and Architectural Management, 2016, 23(6): 782-800 [16] SALAMA T, MOSELHI O. Multi-objective optimization for repetitive scheduling under uncertainty[J]. Engineering, Cons- truction and Architectural Management, 2019, 26(7): 1294-1320 [17] ROGHABADI M A, MOSELHI O. Optimized crew selection for scheduling of repetitive projects[J]. Engineering, Construction and Architectural Management, 2021, 28(6): 1517-1540 [18] NGUYEN D T, LE-HOAI L, TARIGAN P B, etal. Trade-off time cost quality in repetitive construction project using fuzzy logic approach and symbiotic organism search algorithm[J]. Alexandria Engineering Journal, 2022, 61(2): 1499-1518 [19] KE H, LIU B. Fuzzy project scheduling problem and its hybrid intelligent algorithm[J]. Applied Mathematical Modelling, 2010, 34(2): 301-308 [20] PONZ-TIENDA J L, PELLICER E, BENLLOCH-MARCO J, et al. The fuzzy project scheduling problem with minimal genera-lized precedence relations[J]. Computer-Aided Civil and Infrastructure Engineering, 2015, 30(11): 872-891 [21] CHEN S P, TSAI M J. Time–cost trade-off analysis of project networks in fuzzy environments[J]. European Journal of Opera- tional Research, 2011, 212(2): 386-397 [22] XIAO J, WU Z, HONG X X, et al. Integration of electrom-agnetism with multi-objective evolutionary algorithms for RCPSP[J]. European Journal of Operational Research, 2016, 251(1): 22-35
|