[1]Scholl A,Becker C.State of the art exact and heuristic solution procedures for simple assembly line balancing [J].European Journal of Operational Research,2006,168(3):666-693.
[2]兰世海,李蓓智,杨建国,等.基于约束矩阵和遗传算法的装配线平衡优化方法[J].现代制造工程,2007(3):84-86.Lan Sh hai,Li Beizhi,Yang Jianguo, et al. Assembly line balacing optimization based on restricted matrix and genetic algorithm[J].Morden Manufacturing Engineering,2007(3):84-86.
[3]Kulak O,Yilmaz I O,Günther H.A GA based solution approach for balancing printed circuit board assembly lines [J].OR Spectrum,2008,30(3):469-491.
[4]Woodcock A J, Wilson J M. A hybrid tabu search branch and bound approach to solving the generalized assignment problem[J]. European Journal of Operational Research,2010,207(2):566-578.
[5]zcan U,Toklu B.A tabu search algorithm for two sided assembly line balancing[J].International Journal of Advanced Manufacturing Technology,2009,43(7-8):822-829.
[6]Lapierre S D, Ruiz A, Soriano P.Balancing assembly lines with tabu search [J].European Journal of Operational Research,2006,168(3):826-837.
[7]McMullen P R,Tarasewich P.Multi objective assembly line balancing via a modified ant colony optimization technique[J].International Journal of Production Research,2006,44(1):27-42.
[8]Baykasoglu A,Dereli T.Two sided assembly line balancing using an ant colony based heuristic[J].International Journal of Advanced Manufacturing Technology,2008,36(5-6):582-588.
[9]Simaria A S,Vilarinho P M.An ant colony optimization algorithm for balancing two sided assembly lines[J]. Computers & Industrial Engineering,2009,56(2): 489-506.
[10]zcan U U.Balancing stochastic two sided assembly lines:a chance constrained, piecewise linear, mixed integer program and a simulated annealing algorithm[J]. European Journal of Operational Research, 2010,205(1):81-97.
[11]Bautista J, Pereira J. A dynamic programming based heuristic for the assembly line balancing problem [J]. European Journal of Operational Research,2009,194(3):787-794.
[12]Kim Y K, Song W S,Kim J H.A mathematical model and a genetic algorithm for two sided assembly line balancing[J].Computers & Operations Research,2009,36(3):853-865.
[13]Boysen N, Fliedner M, Scholl A. A classification of assembly line balancing problems[J]. European Journal of Operational Research,2007,183(2):674-693.
[14]Salvendy G.工业工程手册[M].北京:清华大学出版社,2005:220,249-251. |