[1]Suri R. Quick response manufacturing: a companywide approach to reducing lead times[M]. Portland, OR: Productivity Press,1998.
[2]Suri R, Krishnamurthy A. How to plan and implement POLCA: a material control system for highvariety or customengineered products[R]. USA: Center for Quick Response Manufacturing, University of Wisconsin, Madison, WI, 2003.
[3]Suri R. It's about time: the competitive advantage of quick response manufacturing[M]. Boca Raton, London: CRC Press, 2010.
[4]Bitran G R, Chang L. A mathematical programming approach to a deterministic kanban system[J]. Management Science, 1987, 33(4): 427-441.
[5]Panayiotou C G, Cassandras C G. Optimization of kanbanbased manufacturing systems[J]. Automatica, 1999, 35(9): 1521-1533.
[6]Spearman M L, Woodruff D L, Hopp W J. CONWIP: a pull alternative to kanban[J]. International Journal of Production Research, 1990, 28(5): 879-894.
[7]Duenyas I, Hopp W J, Spearman M L. Characterizing the output process of a CONWIP line with deterministic processing and random outages[J]. Management Science, 1993, 39(8): 975-988.
[8]Framinan J, Gonzalez P, RuizUsano R. The CONWIP production control system: review and research issues[J]. Production Planning and Control, 2003, 14(3): 255-265.
[9]Krishnamurthy A, Suri R. Planning and implementing POLCA: a cardbased control system for high variety or custom engineered products[J]. Production planning and control, 2009, 20(7): 596-610.
[10]Vakharia A, Moily J, Huang Y. Evaluating virtual cells and multistage flow shops: analytical approach[J]. International Journal of Flexible Manufacturing Systems, 1999, 11(3):291-314.
[11]Reisman A, Kumar Ashok, Motwani J, et al. Cellular manufacturing: a statistical review of the literature (1965-1995)[J]. Operations Research, 1997, 45(4): 508-520.
[12]Singh N. Design of cellular manufacturing systems: an invited review[J]. European Journal of Operational Research, 1993, 69(3): 281-511.
[13]Balakrishnan J, Cheng C H. Multiperiod planning and uncertainty issues in cellular manufacturing: a review and future directions[J]. European Journal of Operational Research, 2007,177(16): 281-309.
[14]Suri R. QRM and POLCA: a winning combination for manufacturing enterprises in the 21st century[R].USA: Center for Quick Response Manufacturing, University of WisconsinMadison, USA, May 2003.
[15]Fernandes N O, Silva S C. Generic POLCAa production and materials flow control mechanism for quick response manufacturing[J]. International Journal of Production Economics, 2006, 104(1): 74-84.
[16]Riezebos J. Polca simulation of a unidirectional flow system[DB/OL]. (2006-07-03).http:∥www.bdk.rug.nl/organisatie/clusters/PSD/pdf/GTCM2006Riezebos.pdf.
[17]Baysan S, Kabadurmus O, Durmusoglu M B. Economic analysis of POLCA system design via simulation a multicell manufacturing case study[DB/OL].(2007-10-20). http:∥www.google.com.hk.
[18]Vandaele N, Van Nieuwenhuyse I, Claerhout D, et al. Loadbased POLCA: an integrated material control system for multiproduct, multimachine job shops[J]. Manufacturing and Service Operations Management, 2008,10(2): 181-197.
[19]Riezebos J. Design of POLCA material control systems[J]. International Journal of Production Research. 2010, 48(5): 1455-1477. |