[1] WEIN L M, CHEVALIER P B. A broader view of the job shop scheduling problem[J]. Management Science, 1992, 38(7): 1018-1033 [2] 张国辉, 吴立辉, 聂黎, 等. 考虑机器故障的柔性作业车间鲁棒调度方法[J]. 系统仿真学报, 2016, 28(4): 867-873 ZHANG Guohui, WU Lihui, NIE Li, et al. Robust flexible job shop scheduling method with machine breakdowns[J]. Journal of System Simulation, 2016, 28(4): 867-873 [3] 昝翔, 陈春良, 张仕新, 等. 考虑时间不确定性的战时装备维修任务调度方法[J]. 机械工程学报, 2018, 54(24): 226-232 ZAN Xiang, CHEN Chunliang, ZHANG Shixin, et al. Task scheduling method for wartime equipment maintenance considering time uncertainty[J]. Journal of Mechanical Engineering, 2018, 54(24): 226-232 [4] 朱传军, 宋文家, 张超勇, 等. 基于维修时间窗的柔性作业车间调度优化研究[J]. 中国机械工程, 2016, 27(10): 1337-1343 ZHU Chuanjun, SONG Wenjia, ZHANG Chaoyong, et al. Research on optimization of FJSP based on maintenance time window[J]. China Mechanical Engineering, 2016, 27(10): 1337-1343 [5] SHARMA P, JAIN A. A review on job shop scheduling with setup times[J]. Journal of Engineering Manufacture, 2016, 230(3): 517-533 [6] ALLAHVERDI A. The third comprehensive survey on scheduling problems with setup times/costs[J]. European Journal of Operational Research, 2015, 246(2): 345-378 [7] CHAUDHRY I A, KHAN A A. A research survey: review of flexible job shop scheduling techniques[J]. International Transactions in Operational Research, 2016, 23(3): 551-591 [8] 赵宁, 李开典, 田青, 等. 考虑运输时间柔性作业车间调度问题的快速寻优方法[J]. 计算机集成制造系统, 2015, 21(3): 724-732 ZHAO Ning, LI Kaidian, TIAN Qing, et al. Fast optimization approach of flexible job shop scheduling with transport time consideration[J]. Computer Integrated Manufacturing Systems, 2015, 21(3): 724-732 [9] 黄刚, 庞志国, 胡振华. 带准备时间的作业车间分批调度算法[J]. 工业工程, 2007, 10(6): 91-95, 121 HUANG Gang, PANG Zhiguo, HU Zhenhua. Algorithms for lot split scheduling with setup time[J]. Industrial Engineering Journal, 2007, 10(6): 91-95, 121 [10] 王凌. 车间调度及其遗传算法[M]. 北京: 清华大学出版社, 2003. [11] 张超勇, 饶运清, 刘向军, 等. 基于POX交叉的遗传算法求解Job-Shop调度问题[J]. 中国机械工程, 2004, 15(23): 2149-2153 ZHANG Chaoyong, RAO Yunqing, LIU Xiangjun, et al. An improved genetic algorithm for the job shop scheduling problem[J]. China Mechanical Engineering, 2004, 15(23): 2149-2153 [12] 张国辉, 高亮, 李培根, 等. 改进遗传算法求解柔性作业车间调度问题[J]. 机械工程学报, 2009, 45(7): 145-151 ZHANG Guohui, GAO Liang, LI Peigen, et al. Improved genetic algorithm for the flexible job-shop scheduling problem[J]. Journal of Mechanical Engineering, 2009, 45(7): 145-151 [13] 赵诗奎. 求解柔性作业车间调度问题的两级邻域搜索混合算法[J]. 机械工程学报, 2015, 51(14): 175-184 ZHAO Shikui. Bilevel neighborhood search hybrid algorithm for the flexible job shop scheduling problem[J]. Journal of Mechanical Engineering, 2015, 51(14): 175-184
|