[1] 张生瑞, 严宝杰. 交通运输系统协调发展的理论分析[J]. 长安大学学报(自然科学版), 2002, 22(2):51-53.ZHANG Shengrui, YAN Baojie. Analysis of the transportation system coordination[J]. Journal of Chang'an University (Natural Science Edition), 2002, 22(2):51-53.
[2] 车兆学. 安家岭露天煤矿内排开拓运输系统优化[J]. 采矿与安全工程学报, 2007, 24(4):494-497+501.CHE Zhaoxue. Optimization of Internal Dumping Development Haulage System in An Jialing Surface Coal Mine[J]. Journal of Mining & Safety Engineering, 2007, 24(4):494-497+501.
[3] 周伟, 才庆祥, 谢廷堃, 等. 大型近水平露天煤矿转向期间开拓运输系统优化研究[J]. 采矿与安全工程学报, 2008, 25(4):404-408.ZHOU Wei, CAI Qingxiang, XIE Tingkun, et al. Optimization of In-Pit development transport system during transitional period in large open pit mine with flat coal deposit[J]. Journal of Mining & Safe ty Engineering, 2008, 25(4):404-408.
[4] 倪兴华. 安全高效矿井辅助运输关键技术研究与应用[J]. 煤炭学报, 2010, 35(11):1909-1915.NI Xinghua. Research and application of key technology for safety and high efficient mine auxiliary transportation[J]. Journal of China Coal Society, 2010, 35(11):1909-1915.
[5] 陈虹微, 王荣杰. 矿车轮对密封与润滑分析及改进[J]. 润滑与密封, 2006(06):181-182.CHEN Hongwei, WANG Rongjie. Analysis and improvement of sealing and lubrication of wheel wheelsets[J]. Lubricat Ion Engineering, 2006(06):181-182.
[6] 赵红泽, 张瑞新, 秦建明, 甄选. 安家岭露天煤矿运煤卡车通道水平优化研究[J]. 中国矿业大学学报, 2011, 40(6):917-921.ZHAO Hongze, ZHANG Ruixin, QIN Jianming. Optimization of the trench level for the coal truck of an internal waste dump at the An Jialing surface mine[J]. Journal of China University of Mining & Technology, 2011, 40(6):917-921.
[7] 牛占文, 荆树伟, 杨福东. 基于精益管理的制造型企业管理创新驱动因素分析——四家企业的案例研究[J]. 科学学与科学技术管理, 2015(07):116-126.NIU Zhanwen, JING Shuwei, YANG Fudong. An analysis of driving factors of the management innovation of manufacturing enterprises based on lean management:case studies of four enterprises[J]. Science of Science and Management of S. & T., 2015(07):116-126.
[8] 牛占文, 吴秀婷, 岳楼. 基于精益生产的某离合器公司装配车间优化[J]. 工业工程与管理, 2015, 20(2):1-6+32.NIU Zhanwen, WU Xiuting, YUE Lou. Optimization of assembly shop of clutch enterprise based on lean production[J]. Industrial Engineering and Management, 2015, 20(2):1-6+32.
[9] 吉鸿荣. 基于精益思想的企业内部知识链模型优化[J]. 科技进步与对策, 2012, 29(2):141-144.JI Hongrong. Knowledge chain model optimization of inner enterprise based on lean thinking[J]. Science&Technology Progress and Policy, 2012, 29(2):141-144.
[10] 李军, 徐明强. 基于价值流的汽车座椅滑轨生产线分析与改善[J]. 工业工程与管理, 2008, 13(1):122-126.LI Jun, XU Mingqiang, Analysis and improvement of a slippery track production line based on the value flowized[J]. Industrial Engineering and Management, 2008, 13(1):122-126.
[11] 胡适, 蔡厚清. 精益生产成本管理模式在我国汽车企业的运用及优化[J]. 科技进步与对策, 2010, 27(16):78-81.HU Shi, CAI Houqing. The application and optimization of cost management model of lean production in automotive firms[J]. Science&Technology Progress and Policy, 2010, 27(16):78-81.
[12] 陈佳祺, 郭为忠. 基于生产线仿真分析的关键工位诊断与改进设计[J]. 机械设计与研究, 2017, 33(1):83-86.CHEN Jiaqi, GUO Weizhong. Modification design research and diagnosis of key processs based on simulation analysis[J]. Machine Design and Research, 2017, 33(1):83-86.
[13] 刘俨后, 左敦稳, 张丹. 随机作业时间的装配线平衡问题[J]. 计算机集成制造系统, 2014, 20(6):1372-1378.LIU Yanhou, ZUO Dunwen, ZHANG Dan. Assembly line balancing with stochastic operation times[J]. Computer Integrated Manufacturing Systems, 2014, 20(6):1372-1378.
[14] 文龙. C企业液晶屏生产线平衡改善研究[D].成都:西南交通大学,2013.WEN Long. The balance improvement research of C enterprise's LCD screen assembly line[D]. Chengdu:Southwest Jiaotong University,2013.
[15] HEKMATPANAH M. The application of cause and effect diagram in sepahan oil company[J]. World Academy of Science, Engineering and Technology, 2011, 78:537-541.
[16] 易树平, 郭伏主编.基础工业工程[M]. 北京:机械工业出版社, 2006.
[17] ALMOMANI M A, ALADEEMY M, ABDELHADI A, et al. A proposed approach for setup time reduction through integrating conventional SMED method with multiple criteria decision-making techniques[J]. Computers & Industrial Engineering, 2013, 66(2):461-469. |