[1] 陈迪, 孙福权, 刘士新. MRO服务中心多技能员工优化调度模型[J]. 东北大学学报(自然科学版), 2016, 37(7): 927-930. CHEN Di, SUN Fuquan, LIU Shixin. Multi-skilled workforce scheduling model for MRO service center [J]. Journal of Northeastern University(Natural Science), 2016, 37(7): 927-930. [2] WARNER R C, NEEDY K L, BIDANDA B. Worker assignment in implementing manufacturing cell[DB/OL].(1997-01)https://www.researchgate.net/publication/279710957_Worker_assignment_in_implementing_manufacturing_cells. [3] CARAMIN M, GIORDANI S.A new approach for scheduling independent tasks with multiple modes[J].Journal of Heuristics, 2009, 15(4): 313-329. [4] BELLENGUEZ M O, NERON E. A branch-and-bound method for solving multi-skill project scheduling problem[J].Operations Research, 2007, 41(2): 155-170. [5] COROMINAS A, PASTOR R, RODRIGUEZ E. Rotational allocation of tasks to multifunctional worker in a service industry[J]. International Journal of Production Economics, 2006, 103(1): 3-9. [6] THOMPSON G M, GOODALE J C. Variable employee productivity in workforce scheduling[J]. European Journal of Operational Research, 2006, 170(2): 376-390. [7] MCDONALD T, ELLIS K, VAN AKEN E, et al. Development and application of a worker assignment model to evaluate a lean manufacturing cell[J]. International Journal of Production Research, 2009, 47(9): 2427-2447. [8] 张猛, 陆志强. 多技能资源约束项目调度问题的改进算法[J]. 计算机集成制造系统, 2016, 22(3): 782-792. ZHANG Meng, LU Zhiqiang. Improved algorithm for multi-skill resource constraint project scheduling problem[J]. Computer Integrated Manufacturing Systems, 2016, 22(3): 782-792. [9] WU H L, LIU J. A multi-agent genetic algorithm based on natural coding for emergency resources scheduling problems[C/OL]. [2016-11-21]. http://ieeexplore.ieee.org/document/7744129/. [10] NAGY G, SALHI S. Heuristic algorithms for single and multiple depot vehicle routing problems with pickups and deliveries[J]. European Journal of Operational Research, 2005, 162(1): 126-141. [11] HU Y H, YE F F, GUO Z Q et al. Multi-shop rescheduling problem under rush orders[C/OL]. [2009-12-28]. http://ieeexplore.ieee.org/document/5363707/?arnumber=5363707. [12] 张俊伟, 王勃, 马范援. 多仓库多配送点的物流配送算法[J]. 计算机工程, 2005, 31(21): 202-204. ZHANG Junwei, WANG Bo, MA Fanyuan. Algorithm for multi-warehouse and multi-task based logistic assigning[J]. Computer Engineering, 2005, 31(21): 202-204. [13] 吴伟. 基于TransCAD的多服务中心多车型混合装卸车辆路径问题研究[J]. 科技信息, 2013, (25): 102-104. WU Wei. Research on vehicle routing problem based on transCAD in multi service center multi vehicle loading and unloading[J]. Science & Technology Information, 2013(25): 102-104. [14] 黄英杰, 姚锡凡, 谭伟, 等. 基于遗传算法的多车间计划与调度的研究(英文)[J]. 科学技术与工程, 2010, 10(15): 3734-3740. HUANG Yingjie, YAO Xifan, TAN Wei, et al. Planning and scheduling of multi-shops based on an improved genetic algorithm[J]. Science Technology and Engineering, 2010, 10(15): 3734-3740. [15] 代乙君, 张志英, 王维泽. 运输能力有限的分段两阶段多车间调度问题[J]. 计算机工程与应用, 2016, 52(7): 222-228+235. DAI Yijun, ZHANG Zhiying, WANG Weize. Block two-stage and multi-workshop scheduling with transportation consideration[J]. Computer Engineering and Applications, 2016, 52(7): 222-228. [16] 刘民, 吴澄. 制造过程智能优化调度算法及其应用[M]. 北京: 国防工业出版社, 2008: 77-78. LIU Min, WU Cheng. Intelligent optimization scheduling algorithm for manufacturing process and their application[M]. Beijing: National Defence Industry Press, 2008: 77-78. [17] LAI P J, LEE W C. Single-machine scheduling with learning and forgetting effects[J]. Applied Mathematical Modelling, 2013, 37(16): 4509-4516.
|