[1]Bader M, Hall R, Strasser G. Integrated processing equipment [J]. Solid State Technology, 1990,33(5):149-154.
[2]Burggraaf P. Coping with the high cost of wafer fabs [J]. Semiconductor International, 1995, 38(3):45-50.
[3]Perkinson T L, MacLarty P K, Gyurcsik R S, Cavin R K, III. Singlewafer cluster tool performance: an analysis of throughput [J]. IEEE Trans. on Semiconductor Manufacturing, 1994,7(3): 369-373.
[4]Perkinson T L, Gyurcsik R S, MacLarty P K. Single-wafer cluster tool performance: an analysis of the effects of redundant chambers and revisitations sequences on throughput [J]. IEEE Transactions on Semiconductor Manufacturing, 1996, 9(3): 384-400.
[5]Venkatesh S, Davenport R, Foxhoven P, Nulman. J A steady state throughput analysis of cluster tools: dual-blade versus single-blade robots [J]. IEEE Transactions on Semiconductor Manufacturing, 1997,10(4): 418-424.
[6]Ding S, Yi J, Zhang M. Scheduling multi-cluster tools: an integrated event graph and network model approach [J]. IEEE Trans. on Semiconductor Manufacturing, 2006,19(3):339-351.
[7]Zuberek W M. Timed Petri nets in modeling and analysis of cluster tools[J]. IEEE Transactions on Robotics and Automation, 2001,17(5):562-575.
[8]Shin Y H, Lee T E, Kim J H, Lee H Y. Modeling and implementing a real-time scheduler for dual-armed cluster tools [J]. Computers In Industry, 2001, 45(1): 13-27.
[9]Kim J H, Lee T E, Lee H Y, Park D B. Scheduling analysis of timed-constrained dual-armed cluster tools [J]. IEEE Transactions on Semiconductor Manufacturing,2003,16(3):521-534.
[10]Lee T E, Lee H Y, Shin Y H. Workload balancing and scheduling of a single-armed cluster tool[C].Proceedings of the 5th APIEMS Conference[EB/OL]. 2004:1-15.
[11]Lopez M J, Wood S C. Systems of multiple cluster toolsconfiguration, reliability, and performance [J]. IEEE Transactions on Semiconductor Manufacturing,2003,16(2):170-178.
[12]Lee H Y, Lee T E. Scheduling single-armed cluster tools with reentrant wafer flows[J]. IEEE Transactions on Semiconductor Manufacturing, 2006,19(2):226-240.
[13]Zuberek W M. Cluster tools with chamber revisiting-modeling and analysis using timed Petri nets [J]. IEEE Transactions on Semiconductor Manufacturing,2004,17(3)333-344.
[14]Wu N Q, Chu F, Chu C B, Zhou M C. Petri net-based scheduling of single-arm cluster tools with reentrant atomic layer deposition processes [J]. IEEE Transactions on Automation Science and Engineering, 2011,8(1):42-55 .
[15]Wu N Q, Chu F, Chu C B, Zhou M C. A novel approach to scheduling of single-arm cluster tools with wafer revisiting[C]. Proceedings of the 5th IEEE Conference on Automation Science and Engineering,India: Bangalore,2009:22-25, 567-572.
[16]潘春荣,伍乃骐.晶圆制造自动化组合设备的调度问题研究[J].计算机集成制造系统, 2009, 15(3): 522-528.
Pan Chun-rong, Wu Nai-qi. Scheduling of cluster tools in wafer fabrication [J]. Computer Integrated Manufacturing Systems, 2009, 15(3): 522-528.
[17]施於人,邓易元,蒋维.eM-Plant仿真技术教程[M]. 北京:科学出版社,2009. |