[1]Myers S C. A note on linear programming and capital budgeting[J]. The Journal of Finance, 1972,27(1):89-92.
[2]Megginson W L. Corporate finance theory[M]. MA: Addison Wesley, 1997.
[3]Padberg M. Optimal project selection when borrowing and lending rates differ[J]. Mathematical and Computer Modelling,1999,29(3): 63-78. [4]Liu B, Iwamura J. Chance constrained programming with fuzzy parameters[J]. Fuzzy Sets and Systems, 1998, 94(2): 227-237.
[5]Liu B. Theory and practice of uncertain programming[M].Heideberg:Physica Verlag,2002.
[6]刘宝碇,赵瑞清,王纲. 不确定规划及应用[M]. 北京:清华大学出版社,2003.
[7]张晓丽. 多目标模糊优化方法及其在工程设计中应用[J]. 大连理工大学学报,2005,45(3):374-378.
Zhang Xiaoli. Multi-objective fuzzy optimization method and its practical application to engineering design[J]. Journal of Dalian University of Technology, 2005, 45(3): 374-378.
[8]Weingartner H M.Mathematical programming and the analysis of capital budgeting problems[M]. New Jersey: Englewood Press, 1963. [9]Zadeh L A. Fuzzy sets[J]. Information and Control,1965,8(3):338-353.
[10]Liu B, Liu Y K. Expected value of fuzzy variable and fuzzy expected value models[J]. IEEE Transactions on Fuzzy Systems, 2002,10(4):445-450.
[11]Liu B. Uncertainty theory:an Introduction to its axiomatic foundations[M].Berlin: Springer Verlag, 2004.
[12]Kumar N V, Ganesh L S. An empirical analysis of the use of the analytic hierarchy process for estimating membership values in a fuzzy set[J].Fuzzy Sets and Systems,1996,82(1):1-16. [13]Avineri E, Prashker J, Ceder A, Transportation projects selection process using fuzzy sets theory[J].Fuzzy Sets and Systems,2000,116(1):35-47.
[14]Charnes A, Cooper W W. Chanceconstrained programming[J].Management Science,1959,6(1):73-79. [15]Holland J H. Adaptation in natural and artificial systems[M].Ann Arbor: University of Michigan Press, 1975.
[16]Huang X. Chance-constrained programming models for capital budgeting with NPV as fuzzy parameters[J]. Journal of Computational and Applied Mathematics, 2007,198(1):149-159. |