Industrial Engineering Journal ›› 2017, Vol. 20 ›› Issue (2): 44-50.doi: 10.3969/j.issn.1007-7375.e16-1218

Previous Articles     Next Articles

A Study of Job-Shop Scheduling Based on Multi-Resource Constrained

FAN Jiajing   

  1. School of Economics and Management, Zhejiang University of Science and Technology, Hangzhou 310023, China
  • Received:2016-08-13 Online:2017-04-30 Published:2017-05-13

Abstract: Considering that machines, workers and robots are important human resource and that robots are widely applied in manufacturing company, a job-shop scheduling problem is put forward based on multi-resource constraint, in order to better adapt the actual scheduling demand of modern enterprises. Aiming at minimum sum of delivery penalty cost, machines and robot operation cost and employee wage cost, a 0-1 integer program mathematical model is built. An advanced genetic algorithm presented to solve this model according to the complexity and characteristics of the scheduling model. At last through an analysis of seven cases of different scales, the validity of the model and algorithm is proven.

Key words: robot, multi-resource, scheduling, advanced genetic algorithm

CLC Number: