[1] 岩石. 我国民航维修业之现状与发展[J]. 航空制造技术, 2009(S2): 67-70. YAN Shi. Present situation and development of civil aviation maintenance industry in China[J]. Aeronautical Manufacturing Technology. 2009(S2): 67-70. [2] REMÉNYI C, STAUDACHER S. Systematic simulation based approach for the identification and implementation of a scheduling rule in the aircraft engine maintenance[J]. International Journal of Production Economics, 2014, 147: 94-107. [3] EICKEMEYER S C, NYHUIS P. Capacity planning and coordination with fuzzy load information[J]. The Business Review, Cambridge, 2010, 16(1): 259-264. [4] AYENI P, BALL P, BAINES T, et al. Towards the strategic adoption of Lean in aviation Maintenance Repair and Overhaul (MRO) industry: an empirical study into the industry's Lean status[J]. Journal of Manufacturing Technology Management, 2016, 27(1): 38-61. [5] GUIDE V D R, SRIVASTAVA R, KRAUS M E. Product structure complexity and scheduling of operations in recoverable manufacturing[J]. International Journal of Production Research, 1997, 35(11): 3179-3200. [6] GUIDE V D R, JAYARAMAN V, SRIVASTAVA R. Production planning and control for remanufacturing: a state-of-the-art survey[J]. Robotics and Computer Integrated Manufacturing, 1999, 15(3): 221-230. [7] GUIDE V D R. Production planning and control for remanufacturing: industry practice and research needs[J]. Journal of Operations Management, 2000, 18(4): 467-483. [8] JUNIOR M L, FILHO M G. Production planning and control for remanufacturing: literature review and analysis[J]. Production Planning & Control, 2012, 23(6): 419-435. [9] GUIDE V D R, KRAUS M E, SRIVASTAVA R. Scheduling policies for remanufacturing[J]. International Journal of Production Economics, 1997, 48(2): 187-204. [10] GUIDE V D R, SOUZA G C, VAN DER LAAN E. Performance of static priority rules for shared facilities in a remanufacturing shop with disassembly and reassembly[J]. European Journal of Operational Research, 2005, 164(2): 341-353. [11] GUPTA S, TALEB K. Scheduling disassembly[J]. The International Journal of Production Research, 1994, 32(8): 1857-1866. [12] JUNIOR M L, FILHO M G. Master disassembly scheduling in a remanufacturing system with stochastic routings[J]. Central European Journal of Operations Research, 2015, 25(2): 1-16. [13] MORGAN S D, GAGNON R J. A systematic literature review of remanufacturing scheduling[J]. International Journal of Production Research, 2013, 51(16): 4853-4879. [14] ALLAHVERDI A, AYDILEK H. The two stage assembly flow-shop scheduling problem to minimize total tardiness[J]. Journal of Intelligent Manufacturing, 2014, 26(2): 225-237. [15] HATAMI S, RUIZ R, ANDRÉS-ROMANO C. The distributed assembly permutation flow-shop scheduling problem[J]. International Journal of Production Research, 2013, 51(17): 5292-5308. [16] LUH P B, YU D, SOORAPANTH S, et al. A Lagrangian relaxation based approach to schedule asset overhaul and repair services[J]. IEEE Transactions on Automation Science and Engineering, 2005, 2(2): 145-157. [17] CHEN C H, LIN J, YCESAN E, et al. Simulation budget allocation for further enhancing the efficiency of ordinal optimization[J]. Discrete Event Dynamic Systems, 2000, 10(3): 251-270. [18] XU J, ZHANG S, HUANG E, et al. MO2TOS: Multi-fidelityoptimization with ordinal transformation and optimal sampling[J]. Asia-Pacific Journal of Operational Research, 2016, 33(03): 1608-1620. [19] MOLINA-CRIST'OBAL A, PALMER P R, SKINNER B, et al. Multi-fidelity simulation modelling in optimization of a submarine propulsion system[C/OL]. Lille, France: Vehicle Power and Propulsion Conference (VPPC), 2010: 1-6[2017-11-30]. http://ieeexplore.ieee.org/document/5729081/. [20] BALABANOV V, VENTER G. Multi-fidelity optimization with high-fidelity analysis and low-fidelity gradients[C/OL]. Albany, New York, USA: 10th AIAA/ISSMO Multidisciplinary Analysis and Optimization Conference, 2004[2017-11-30]. https://doi.org/10.2514/6.2004-4459. |