[1] 蒋国萍, 陈英武. 基于关键链的软件项目进度风险管理[J]. 计算机应用, 2005, 25(1): 56-57+72. JIANG Guoping, CHEN Yingwu. Schedule risk management method of software project based on critical chain[J]. Journal of Computer Applications, 2005, 25(1): 56-57+72. [2] 何剑虹, 白晓颖, 胡林平. 软件项目进度风险的定量分析方法[J]. 计算机科学, 2011, 38(04): 164-169. HE Jianhong, BAI Xiaoying, HU Linping. Quantitative risk analysis of software project schedule management[J]. Computer Science, 2011, 38(04): 164-169. [3] 曹萍, 陈福集, 张剑. 基于进度的软件外包项目风险优化控制决策[J]. 武汉大学学报(工学版), 2012, 45(3): 385-388. CAO Ping, CHEN Fuji, ZHANG Jian. Risk optimization control decision-making of software outsourcing project based on schedule[J]. Engineering Journal of Wuhan University, 2012, 45(3): 385-388. [4] 王桂森, 李向阳, 王军. 在线服务风险管理的蚁群优化算法[J]. 运筹与管理, 2009, 18(3): 52-56. WANG Guisen, LI Xiangyang, WANG Jun. Online services risk management with ANT algorithm[J]. Operations Research and Management Science, 2009, 18(3): 52-56. [5] ACAN A, ÜNVEREN A. A great deluge and tabu search hybrid with two-stage memory support for quadratic assignment problem[J]. Applied Soft Computing, 2015, 36: 185-203. [6] 王有为. 基于禁忌表的捕食搜索算法及其在旅行商问题中的实验研究[J]. 系统工程理论与实践, 2008, 28(2): 131-136. WANG Youwei. Predatory search algorithm based on tabu list and its experimental research on travelling salesman problems[J]. System Engineering Theory and Practice, 2008, 28(2): 131-136. [7] ZHU W, QIN H, LIM A, et al. A two-stage tabu search algorithm with enhanced packing heuristics for the 3L-CVRP and M3L-CVRP[J]. Computers & Operations Research, 2012, 39(9): 2178-2195. [8] ALLAHVERDI A, AL-ANZI F S. A PSO and a Tabu search heuristics for the assembly scheduling problem of the two-stage distributed database application[J]. Computers & Operations Research, 2006, 33(4): 1056-1080. [9] SUKKERD W, WUTTIPORNPUN T. Hybrid genetic algorithm and tabu search for finite capacity material requirement planning system in flexible flow shop with assembly operations[J]. Computers & Industrial Engineering, 2016, 97: 157-169. [10] 卢福强, 黄敏, 王兴伟. 虚拟企业风险管理的两层分布式决策模型[J]. 计算机集成制造统, 2009, 15(10): 1930-1937. LU Fuqiang, HUANG Min, WANG Xingwei. Two levels distributed decision-making model for risk management of virtual enterprise[J]. Computer Integrated Manufacturing Systems, 2009, 15(10): 1930-1937. [11] 孙宪丽, 黄敏, 王兴伟. 具有委托代理特征的虚拟企业分布式风险管理[J]. 系统工程学报, 2010, 25(5): 659-665. SUN Xianli, HUANG Min, WANG Xingwei. Distributed decision-making risk management of virtual enterprises with principal agent characteristics[J]. Journal of Systems Engineering, 2010, 25(5): 659-665. [12] 吴登生, 李建平, 孙晓蕾, 等. 考虑风险相关性的软件风险多目标优化控制研究[J]. 系统工程理论与实践, 2015, 35(3): 578-586. WU Dengsheng, LI Jianping, SUN Xiaolei, et al. Multi-object risk control model for software project considering risk correlation[J]. System Engineering Theory and Practice, 2015, 35(3): 578-586. [13] 卢福强, 毕华玲, 黄敏, 等. IT外包进度风险控制的结构化分布式决策模型[J]. 系统工程, 2016, 34(7): 138-145. LU Fuqiang, BI Hualing, HUANG Min, et al. Structured distributed decision model for risk control of IT outsourcing[J]. Systems Engineering, 2016, 34(7): 138-145. [14] LINHARES A. Preying on optima: a predatory search strategy for combinatorial problems[C]//IEEE International Conference on Systems, Man, and Cybernetics. IEEE, 1998: 2974-2978. [15] LINHARES A. State-space search strategies gleaned from animal behavior: A traveling salesman experiment [J]. Biological Cybernetics, 1998, 78(3): 167-173. [16] LINHARES A. Synthesizing a Predatory Search Strategy for VLSI Layouts [J]. IEEE Transaction On Evolutionary Computation, 1999, 3(2): 147-152. [17] 汪定伟, 王俊伟, 王洪峰, 等. 智能优化方法[M].北京: 高等教育出版社, 2007: 258-277. [18] BOESC K.D., KAHNG A.B., MUDDU S. A new adaptive multi-start technique for combinatorial global optimizations [J]. Operations Research Letters, 1994, 16: 101-113. [19] REEVES C. R. Landscapes, operators, and heuristic search [J]. Annals Operations Research, 1999, 86: 473-490.
|